ALPC 9000 series
Performing Maintenance
Carry out a lamp test on the mains box
Press the (B) key on the mains box to
test the lamp. All the lamps in the keys /
switches should now light up.
Do not replace lamps which are not lit up
immediately.
Check the sealing ring on the pressure dome
Check the sealing ring on the
pressure dome daily for damage
and swelling.
Replace it if necessary.
The O-Ring must lie against the
pressure dome.
Clean the suction screen on the flushing fluid tank suction hose.
Clean the suction screen on the flushing
fluid suction hose by blowing it out with
compressed air.
HYDAC FILTER SYSTEMS GMBH
en
Page 48 / 68
BEWA ALPC9000 3601005 en 2011-04-07.doc
2011-04-06
Содержание ALPC 9000 Series
Страница 67: ......