Performing inspection / maintenance
4. Then start the suction of the test liquid
in the CTU software. The added test
liquid is suctioned into the pre-selected
reservoir
B1
or
B2
.
5. Wait until the test liquid is completely
suctioned out.
6. If you have added more than the
displayed volume in the analysis
chamber, a residual quantity remains in
the analysis chamber.
•
Close the ball valve above the
membrane holder.
•
Open the membrane holder and
place a suitable container for
catching the test liquid underneath
it.
•
Open the ball valve above the
membrane holder and drain the
residual amount from the analysis
chamber.
7. The filling of the system is completed.
CTU 1x3x Series
en(us)
Page 70 / 92
BeWa CTU1x3x 3631694d en-us 2017-03-13.docx
2017-03-13
Содержание CTU 1x3x Series
Страница 89: ...Attachment CTU 1x3x Series en us Page 89 92 BeWa CTU1x3x 3631694d en us 2017 03 13 docx 2017 03 13 ...
Страница 90: ......
Страница 91: ......