Preparing the CTU for operation
Connecting the CTU
Checking connections and contacts
DANGER
Electric shock
Danger of fatal injury
►
Any work involving the power supply may only
be done by a properly trained, certified
electrician.
►
Pull the power plug before performing work on
live parts.
On delivery, the CTU has been pre-installed. Before starting it up, please
check the following:
Remove the transport fixings in the control cabinet.
Keep the box containing the software licenses and operating and
maintenance instructions near the CTU.
Carefully read the operating and maintenance instructions for the CTU as
well as the ConTeS operating instructions.
Using the figure of the X2 terminal strip, check that resistors R1, R2, R3, and
R4 are all fitted correctly.
During transport, resistors may have come undone from the terminal strip
and may be lying loose at the bottom of the switch cabinet.
Put the monitor and the keyboard on the CTU.
Check and connect the power and signal/data cables as shown in the
following illustrations.
CTU 1x3x Series
en(us)
Page 26 / 92
BeWa CTU1x3x 3631694d en-us 2017-03-13.docx
2017-03-13
Содержание CTU 1x3x Series
Страница 89: ...Attachment CTU 1x3x Series en us Page 89 92 BeWa CTU1x3x 3631694d en us 2017 03 13 docx 2017 03 13 ...
Страница 90: ......
Страница 91: ......