.
SECTION 1 INSTALLATION
Upon delivery of your new S20 Series III saw, it is imperative that a thorough inspection be undertaken to check for any
damage that could have been sustained during shipping. Special attention should be paid to the electrical and hydraulic
systems to check for damaged cords and hoses, or for fluid leaks. In the event of damage caused during shipping, contact
your carrier to file for a damage claim.
LIFTING MACHINE
This machine is to be lifted in one, fully assembled piece. In order to lift the machine it needs to be in the following
condition:
•
Saw head in the down position
•
Coolant tank emptied
The S20 Series III may be lifted from the FRONT with a forklift, which has a minimum capacity of 4500 lbs (2040 kg) and a
fork length of 72” (830mm).
The S20 Series III is shrink-wrapped for shipping from our plant. Remove wrapping from the saw and dispose safely.
Complete the inspection for signs of damage. Undo the bolts that hold the saw to the pallet. Retain these bolts to use for
machine leveling.
Содержание S20 SERIES III
Страница 2: ......
Страница 16: ......
Страница 24: ......
Страница 36: ......
Страница 38: ......
Страница 39: ...5 1 FOR HYDRAULIC SCHEMATICS AND PLUMBING DIAGRAMS SEE PDF ON ATTACHED CD SECTION 5 HYDRAULIC ...
Страница 40: ......
Страница 41: ...6 1 FOR MECHANICAL ASSEMBLY DRAWINGS SEE PDF ON ATTACHED CD SECTION 6 MECHANICAL ASSEMBLIES ...
Страница 42: ......
Страница 43: ...7 1 FOR OPTIONAL ASSEMBLY DRAWINGS SEE PDF ON ATTACHED CD SECTION 7 OPTIONS ...
Страница 44: ......
Страница 46: ...8 2 S20 Series III Layout ...
Страница 47: ...8 3 S20 Series III Foot Print ...
Страница 48: ......
Страница 50: ......