Pg 1
S23A 2001a
SECTION 1, INSTALLATION
Upon delivery of your new S-23A saw, it is imperative that a thorough inspection be undertaken to check for
any damage that could have been sustained during shipping. Special attention should be paid to the electrical and
hydraulic systems to check for damaged cords, hoses and fluid leaks. In the event of damage caused during
shipping, contact your carrier to file a damage claim.
SAFETY PRECAUTIONS
The S-23A has been designed to give years of reliable service. It is essential that operators be alerted to the
safe operation of this saw, and the practices to avoid that could lead to injury. The following safety rules are at the
minimum necessary for the safe installation, operation, and maintenance of the saw. Take every precaution for the
protection of operators and maintenance personnel.
POWER HOOK-UPS AND REPAIRS SHOULD BE ATTEMPTED ONLY BY QUALIFIED TRADESMEN.
THE SAW SHOULD BE LOCATED IN AN AREA WITH SUFFICIENT ROOM TO SAFELY LOAD STOCK
INTO THE SAW. SECURE THE SAW TO THE FLOOR.
THE AREA AROUND THE SAW SHOULD BE MAINTAINED IN A CLEAN AND TIDY CONDITION TO AVOID
OBSTACLES OPERATORS COULD TRIP OVER.
THE S-20A SERIES II SHOULD ONLY BE OPERATED ACCORDING TO THE SPECIFICATIONS OF THE
SAW. AVOID UNSAFE USAGE PRACTICES.
IF AT ANY TIME THE SAW DOES NOT APPEAR TO BE OPERATING PROPERLY IT SHOULD BE
STOPPED IMMEDIATELY AND REPAIRED.
OPERATOR :
THE SAW SHOULD NEVER BE OPERATED UNLESS ALL GUARDS AND DOORS ARE
IN PLACE AND CLOSED.
OPERATOR :
KEEP A SAFE DISTANCE FROM ALL MOVING PARTS - ESPECIALLY THE BLADE
AND VISES.
OPERATOR :
LOOSE CLOTHING AND GLOVES SHOULD NEVER BE WORN WHILE OPERATING
THE SAW. COVER LONG HAIR.
OPERATOR :
STOCK SHOULD NOT BE LOADED ONTO THE SAW IF THE BLADE IS RUNNING.
OPERATOR :
LONG AND HEAVY STOCK SHOULD ALWAYS BE PROPERLY SUPPORTED IN
FRONT OF AND BEHIND THE SAW.
OPERATOR :
NEVER ATTEMPT TO DISLODGE OR MOVE STOCK WHILE THE BLADE IS MOVING.
TAKE THE TIME TO STOP THE SAW BLADE, REMOVE OBSTRUCTIONS, AND
RESTART BLADE.
OPERATOR:
MUST WEAR EYE PROTECTION.
OPERATOR:
MAINTAIN PROPER ADJUSTMENT OF BLADE TENSION, BLADE GUIDES, AND
BEARINGS
OPERATOR:
HOLD WORKPIECE FIRMLY AGAINST TABLE.
OPERATOR:
DO NOT REMOVE JAMMED CUTOFF PIECES UNTIL BLADE HAS STOPPED.
NO MODIFICATIONS TO THE MACHINE ARE PERMITTED WITHOUT PRIOR APPROVAL FROM HYD-MECH.
ANY APPROVED MODIFICATIONS SHOULD ONLY BE UNDERTAKEN BY TRAINED PERSONNEL.
Содержание S-23A
Страница 1: ...I N B A N D S A W T E C H N O L O G Y OPERATIONS MAINTENANCE M A N UA L ...
Страница 3: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 7: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 8: ...SECTION 1 INSTALLATION SECTION 1 INSTALLATION ...
Страница 9: ...SECTION 1 INSTALLATION ...
Страница 16: ...SECTION 2 OPERATING INSTRUCTIONS SECTION 2 OPERATING INSTRUCTIONS ...
Страница 17: ...SECTION 2 OPERATING INSTRUCTIONS ...
Страница 41: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 42: ...SECTION 3 MAINTENANCE AND TROUBLE SHOOTING SECTION 3 MAINTENANCE AND TROUBLE SHOOTING ...
Страница 43: ...SECTION 3 MAINTENANCE AND TROUBLE SHOOTING ...
Страница 63: ...Pg 50 S22A S23A mits 2001 SERVICE RECORD NOTES DATE SERVICED BY COMMENTS ...
Страница 64: ...SECTION 4 ELECTRICAL SYSTEM SECTION 4 ELECTRICAL SYSTEM ...
Страница 65: ...SECTION 4 ELECTRICAL SYSTEM ...
Страница 69: ...Pg 54 S23A 2001a SEQUENCER ELECTRICAL PARTS LISTS 0 12 3 4 4 5 6 7 0 3 81 2 8 9 6 0 3 81 2 8 9 7 6 6 ...
Страница 72: ...Pg 57 S23A 2001a OPTIONAL PLC ELECTRICAL PARTS LISTS 0 12 3 4 4 5 6 4 0 12 3 4 4 5 6 1 6 0 12 3 4 4 5 6 7 ...
Страница 75: ...SEQUENCER ELECTRICAL SCHEMATIC WIRING DRAWINGS ...
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ...OPTIONAL PLC ELECTRICAL SCHEMATIC WIRING DRAWINGS ...
Страница 80: ......
Страница 81: ......
Страница 82: ......
Страница 83: ......
Страница 84: ......
Страница 85: ......
Страница 86: ......
Страница 87: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 88: ...SECTION 5 HYDRAULIC SYSTEM SECTION 5 HYDRAULIC SYSTEM ...
Страница 89: ...SECTION 5 HYDRAULIC SYSTEM ...
Страница 91: ...Pg 68 S23A 2001 CYLINDER ASSEMBLIES Piston assemblies Gland assemblies ...
Страница 92: ...Pg 69 S23A 2001 HYDRAULIC SCHEMATIC PLUMBING DRAWINGS ...
Страница 93: ...Pg 70 S23A 2001 ...
Страница 94: ...Pg 71 S23A 2001 ...
Страница 95: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 96: ...SECTION 6 MECHANICAL ASSEMBLIES SECTION 6 MECHANICAL ASSEMBLIES ...
Страница 97: ...SECTION 6 MECHANICAL ASSEMBLIES ...
Страница 98: ...Pg 73 S23A 2001a GUIDE ARM CARBIDE ASSEMBLIES SECTION 6 MECHANICAL ASSEMBLIES ...
Страница 99: ...Pg 74 S23A 2001a BLADE DRIVE ASSEMBLY ...
Страница 101: ...Pg 76 S23A 2001a HM4A GEAR BOX ASSEMBLY ...
Страница 102: ...Pg 77 S23A 2001a IDLER WHEEL ASSEMBLY 01 2345 1 345 1 6 7809 849 59 9 3 01 1 ...
Страница 103: ...Pg 78 S23A 2001a BLADE BRUSH ASSEMBLY ...
Страница 104: ...Pg 79 S23A 2001a COUNTER BALANCE SPRING ASSEMBLY ...
Страница 105: ...Pg 80 S23A 2001a HYDRAULIC TANK ASSEMBLY Less hoses 34 1 2 1 2 34 ...
Страница 106: ...Pg 81 S23A 2001a HYDRAULIC PUMP ASSEMBLY Less hoses ...
Страница 107: ...Pg 82 S23A 2001a PIVOT LINK ASSEMBLY ...
Страница 108: ...Pg 83 S23A 2001a 1 ...
Страница 109: ...Pg 84 S23A 2001a FRONT VISE ASSEMBLY ...
Страница 110: ...Pg 85 S23A 2001a SHUTTLE VISE ASSEMBLY ...
Страница 111: ...Pg 86 S23A 2001a INFEED CONEYOR ASSEMBLY ...
Страница 113: ...Pg 88 S23A 2001a LENGTH CONTROL ASSEMBLY ...
Страница 115: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 116: ...SECTION 7 OPTIONAL ASSEMBLIES SECTION 7 OPTIONAL ASSEMBLIES ...
Страница 117: ...SECTION 7 OPTIONAL ASSEMBLIES ...
Страница 118: ...Pg 91 S22A S23A SECTION 7 OPTIONS WORK STOP ...
Страница 120: ...Pg 93 S22A S23A MITSUBISHI PLC 100 SEE SECTION 2A FOR DETAILS Mitsubishi PLC 100 Control Panel ...
Страница 121: ...Pg 94 S22A S23A PLC LENGTH ENCODER ASSEMBLY Required with the PLC option 01 ...
Страница 124: ...SECTION 8 SPECIFICATIONS SECTION 8 SPECIFICATIONS ...
Страница 125: ...SECTION 8 SPECIFICATIONS ...
Страница 127: ...Pg 98 S23A 2001 LAYOUT DRAWINGS PLC ELECTRICAL SUPPLY LOCATION ...
Страница 128: ...Pg 99 S23A 2001 PLC ELECTRICAL SUPPLY LOCATION SEQUENCER ELECTRICAL SUPPLY LOCATION ...
Страница 129: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 130: ...SECTION 9 WARRANTY SECTION 9 WARRANTY ...
Страница 131: ...SECTION 9 WARRANTY ...