Figure 2
Reflector/Director Detail
Start at the reflector end (boom section that has
the hole drilled in it) and measure approximately
1" from the end of the boom and install the
elementboom bracket as shown in Figure 2. Only
tighten the hardware enough to keep the bracket
in place. Final positioning of this element will
depend upon placement of the driven element and
the dimensions from Figure 4.
Select the Rl sections (7/8" x 72") of tubing and
slip one end of each in each side of the bracket
and tighten the bracket securely with the
exception of the two anchor screws.
DO NOT
tighten at this time
Measure along the boom 65 1/8" from the center
of the reflector element-to-boom bracket and in-
stall the driven element-to-boom bracket. Select
the DE sections and slip the driven element in-
sulators onto one end of the DE1 sections (7/8" x
72").
Now recheck the measurement and make certain
all the elements are aligned evenly.
Measure 74" from the center of the driven element
bracket to the center of the director and install the
director element-to-boom bracket. Select and in-
stall the D1 sections (7/8" x 72") by slipping one
into each side of the bracket and tighten securely.
DO NOT tighten the anchor screws at this time.
Slip the insulated end of the DE1 section into the
driven element bracket and tighten securely. See
Figure 3 for proper installation.
DO NOT tighten
the anchor screws at this time.
Содержание TH-3JRS
Страница 5: ......
Страница 8: ...Figure 7 Beta Match Feedline Attachment Figure 8 RF Choke ...