Protocol™ Installation and
Service Manual
REFRIGERATION PIPING
Important:
Since Hussmann has no direct control over the installation,
providing freeze-burst protection is the responsibility of the
installing contractor.
Refer to Page 48
Always use a pressure regulator with a nitrogen tank.
Do not exceed 2 pisg and
vent lines when brazing. Do not exceed 350 psig for leak testing high side. Do not
exceed 150 psig for leak testing low side.
Always recapture test charge in approved recovery vessel for recycling.
The Water Loop should be tested for leaks using pressurized water.
DO NOT exceed 75 psig at the lowest point in the piping.
Overview
This section details the major refrigeration components and their locations in each piping
system.
Refrigeration Line Piping
Use only clean, dehydrated, sealed refrigeration grade copper tubing. Use dry nitrogen in
the tubing during brazing to prevent the formation of copper oxide. All joints should be
made with silver alloy brazing material, and use 35% silver solder for dissimilar metals.
Liquid and suction lines must be free to expand and contract independently of each other.
Do not clamp or solder them together. Run supports must allow tubing to expand and
contract freely. Do not exceed 100 feet without a change of direction or an offset. Plan
proper pitching, expansion allowance, and P-traps at the base of all suction risers. Use long
radius elbows to reduce flow resistance and breakage. Avoid completely the use of 45°
elbows. Install service valves at several locations for ease of maintenance and reduction of
service costs. These must be UL approved for 450 psig minimum working pressure.
All Protocol™ units have one-inch drip pan at the bottom of the unit. DO NOT run piping
through the bottom of this pan.
Return Gas Superheat
Return gas superheat should be 10 to 30 °F on all units.
Suction Line
1. Install a downward slope in direction of flow. A P-trap is required for all vertical
risers.
2. Line may be reduced by one size after first third of case load and again after the
second third. Do not reduce below evaporator connection size.
3. Suction returns from evaporators must enter at the top of the line.
40
Содержание Proto-Aire
Страница 1: ...9 20 2005 Installation Manual Hussmann Part 0385841 ...
Страница 11: ...Protocol Installation and Service Manual TYPICAL PIPING ELECTRICAL HOOKUP Vertical Units 7 ...
Страница 12: ...Protocol Installation and Service Manual 8 ...
Страница 13: ...Protocol Installation and Service Manual 9 ...
Страница 14: ...Protocol Installation and Service Manual 10 ...
Страница 15: ...Protocol Installation and Service Manual 11 ...
Страница 16: ...Protocol Installation and Service Manual 12 ...
Страница 17: ...Protocol Installation and Service Manual 13 ...
Страница 18: ...Protocol Installation and Service Manual 14 ...
Страница 19: ...Protocol Installation and Service Manual 15 ...
Страница 20: ...Protocol Installation and Service Manual 16 ...
Страница 21: ...Protocol Installation and Service Manual 17 ...
Страница 22: ...Protocol Installation and Service Manual 18 ...
Страница 23: ...Protocol Installation and Service Manual 19 ...
Страница 24: ...Protocol Installation and Service Manual Horizontal Units 20 ...
Страница 25: ...Protocol Installation and Service Manual 21 ...
Страница 26: ...Protocol Installation and Service Manual 22 ...
Страница 27: ...Protocol Installation and Service Manual 23 ...
Страница 28: ...Protocol Installation and Service Manual 24 ...
Страница 29: ...Protocol Installation and Service Manual 25 ...
Страница 30: ...Protocol Installation and Service Manual 26 ...
Страница 31: ...Protocol Installation and Service Manual 27 ...
Страница 32: ...Protocol Installation and Service Manual 28 ...
Страница 33: ...Protocol Installation and Service Manual 29 ...
Страница 34: ...Protocol Installation and Service Manual 30 ...
Страница 35: ...Protocol Installation and Service Manual 31 ...
Страница 36: ...Protocol Installation and Service Manual 32 ...
Страница 37: ...Protocol Installation and Service Manual Proto_Aire Units 33 ...
Страница 38: ...Protocol Installation and Service Manual 34 ...
Страница 39: ...Protocol Installation and Service Manual 35 ...
Страница 40: ...Protocol Installation and Service Manual 36 ...
Страница 41: ...Protocol Installation and Service Manual 37 ...
Страница 42: ...Protocol Installation and Service Manual 38 ...
Страница 43: ...Protocol Installation and Service Manual 39 ...
Страница 58: ...Protocol Installation and Service Manual Very Large Box Very Large Box Pump Station Water Cooled Condenser 54 ...
Страница 62: ...Protocol Installation and Service Manual 58 ...
Страница 68: ...Protocol Installation and Service Manual Electrical Legend 64 ...
Страница 69: ...Protocol Installation and Service Manual Main Power Wiring 208V Two Wide Protocol 65 ...
Страница 70: ...Protocol Installation and Service Manual 208V 5 or 6 Compressor Protocol 66 ...
Страница 71: ...Protocol Installation and Service Manual 460V Two Wide Protocol 67 ...
Страница 72: ...Protocol Installation and Service Manual 460V 5 or 6 Compressor Protocol 68 ...
Страница 73: ...Protocol Installation and Service Manual 460V Two Wide Protocol with Factory installed transformer 69 ...
Страница 74: ...Protocol Installation and Service Manual 460V Two Wide Protocol with Field supplied transformer 70 ...
Страница 75: ...Protocol Installation and Service Manual 460V 5 or 6 Compressor Protocol with Field supplied transformer 71 ...
Страница 76: ...Protocol Installation and Service Manual 600V Two Wide Protocol 72 ...
Страница 77: ...Protocol Installation and Service Manual 600V 5 or 6 Compressor Protocol 73 ...
Страница 78: ...Protocol Installation and Service Manual 600V Two Wide Protocol with Field supplied transformer 74 ...
Страница 81: ...Protocol Installation and Service Manual Control and Compressor Wiring PCS without Vapor Wiring 77 ...
Страница 82: ...Protocol Installation and Service Manual PCS with Vapor Wiring 78 ...
Страница 83: ...Protocol Installation and Service Manual CPC Danfoss Comtrol without Vapor Wiring 79 ...
Страница 84: ...Protocol Installation and Service Manual CPC Danfoss Comtrol with Vapor Wiring 80 ...
Страница 85: ...Protocol Installation and Service Manual Controller Wiring PCS 81 ...
Страница 86: ...Protocol Installation and Service Manual CPC 82 ...
Страница 87: ...Protocol Installation and Service Manual CPC Einstein 83 ...
Страница 88: ...Protocol Installation and Service Manual Danfoss 84 ...
Страница 89: ...Protocol Installation and Service Manual Comtrol 85 ...
Страница 99: ...Protocol Installation and Service Manual 95 ...
Страница 100: ...Protocol Installation and Service Manual 96 ...
Страница 101: ...Protocol Installation and Service Manual POWERLINK Operation 97 ...