
Protocol™ Installation and
Service Manual
N/A, go to the Protocol™ configuration menu and access the Protocol Setup
submenu. Enter the DEFR Setup program the control with the correct
number of defrost circuits. Repeat this step to verify that the circuit is
activated.
Step B7
Verifying the defrost circuit configuration. Check the number of defrosts
per day, the defrost length and defrost start times to ensure proper
configuration. Go to Step B9.
Step B8
Verifying the Defrost Output Assignments. Verify that the correct output(s)
have been assigned to the appropriate defrost circuit. Now that all
programming information has been verified, return to Step B3 to force the
defrost on.
Step B9
Verifying the Defrost Output Assignments. Verify that the correct output(s)
have been assigned to the appropriate defrost circuit. If the correct outputs
have been assigned, and the status reveals the circuit is in defrost, and check
the ribbon cable between the control board and defrost board. Try replacing
the ribbon cable with one from another Protocol™ to verify they cable is
good or bad. If the cable is good, replace the control board. The defrost
output drive chip has possibly been damaged. If the correct outputs have
not been assigned, enter the correct programming and repeat this step.
Step B10
Electrical Wiring Check. Use a digital voltmeter to verify where the circuit
is being broken. Power for defrost solenoids originates from the ‘X1’
terminal block, passes through the fuse relay located on the defrost board,
and ends at the terminal block located in the power distribution block. If the
fuse on the defrost board has blown, try replacing it with another fuse and
repeat the voltage checks.
For electric defrosts, a minimum of two defrost outputs will be used for
defrost: one for the solenoid and one for the defrost heaters. The power for
the solenoid can be checked as described previously in this step. To verify
the defrost heater wiring go to Step B12.
Step B11
POWERLINK™ wiring. You may want to first familiarize yourself with
information on POWERLINK™ Operation as detailed in this manual.
Visually inspect that the circuit breaker handles of the POWERLINK™(S),
located on the bus bars within the control panel, are in the ON position. If
the handle is in the ON position, use a digital meter and check for voltage at
the terminals of the POWERLINK™ device and again at the terminal blocks
in the power distribution panel. If voltage is not present at these two points,
got to Step B13.
Step B12
POWERLINK™ Power Supply Check. Using a digital meter, inspect the
POWERLINK™ Power Supply, which provides power for the
POWERLINK™ device. Set your digital meter for DC voltage. There
should be 24 VDC across the terminals of the POWERLINK™ Power
111
Содержание Proto-Aire
Страница 1: ...9 20 2005 Installation Manual Hussmann Part 0385841 ...
Страница 11: ...Protocol Installation and Service Manual TYPICAL PIPING ELECTRICAL HOOKUP Vertical Units 7 ...
Страница 12: ...Protocol Installation and Service Manual 8 ...
Страница 13: ...Protocol Installation and Service Manual 9 ...
Страница 14: ...Protocol Installation and Service Manual 10 ...
Страница 15: ...Protocol Installation and Service Manual 11 ...
Страница 16: ...Protocol Installation and Service Manual 12 ...
Страница 17: ...Protocol Installation and Service Manual 13 ...
Страница 18: ...Protocol Installation and Service Manual 14 ...
Страница 19: ...Protocol Installation and Service Manual 15 ...
Страница 20: ...Protocol Installation and Service Manual 16 ...
Страница 21: ...Protocol Installation and Service Manual 17 ...
Страница 22: ...Protocol Installation and Service Manual 18 ...
Страница 23: ...Protocol Installation and Service Manual 19 ...
Страница 24: ...Protocol Installation and Service Manual Horizontal Units 20 ...
Страница 25: ...Protocol Installation and Service Manual 21 ...
Страница 26: ...Protocol Installation and Service Manual 22 ...
Страница 27: ...Protocol Installation and Service Manual 23 ...
Страница 28: ...Protocol Installation and Service Manual 24 ...
Страница 29: ...Protocol Installation and Service Manual 25 ...
Страница 30: ...Protocol Installation and Service Manual 26 ...
Страница 31: ...Protocol Installation and Service Manual 27 ...
Страница 32: ...Protocol Installation and Service Manual 28 ...
Страница 33: ...Protocol Installation and Service Manual 29 ...
Страница 34: ...Protocol Installation and Service Manual 30 ...
Страница 35: ...Protocol Installation and Service Manual 31 ...
Страница 36: ...Protocol Installation and Service Manual 32 ...
Страница 37: ...Protocol Installation and Service Manual Proto_Aire Units 33 ...
Страница 38: ...Protocol Installation and Service Manual 34 ...
Страница 39: ...Protocol Installation and Service Manual 35 ...
Страница 40: ...Protocol Installation and Service Manual 36 ...
Страница 41: ...Protocol Installation and Service Manual 37 ...
Страница 42: ...Protocol Installation and Service Manual 38 ...
Страница 43: ...Protocol Installation and Service Manual 39 ...
Страница 58: ...Protocol Installation and Service Manual Very Large Box Very Large Box Pump Station Water Cooled Condenser 54 ...
Страница 62: ...Protocol Installation and Service Manual 58 ...
Страница 68: ...Protocol Installation and Service Manual Electrical Legend 64 ...
Страница 69: ...Protocol Installation and Service Manual Main Power Wiring 208V Two Wide Protocol 65 ...
Страница 70: ...Protocol Installation and Service Manual 208V 5 or 6 Compressor Protocol 66 ...
Страница 71: ...Protocol Installation and Service Manual 460V Two Wide Protocol 67 ...
Страница 72: ...Protocol Installation and Service Manual 460V 5 or 6 Compressor Protocol 68 ...
Страница 73: ...Protocol Installation and Service Manual 460V Two Wide Protocol with Factory installed transformer 69 ...
Страница 74: ...Protocol Installation and Service Manual 460V Two Wide Protocol with Field supplied transformer 70 ...
Страница 75: ...Protocol Installation and Service Manual 460V 5 or 6 Compressor Protocol with Field supplied transformer 71 ...
Страница 76: ...Protocol Installation and Service Manual 600V Two Wide Protocol 72 ...
Страница 77: ...Protocol Installation and Service Manual 600V 5 or 6 Compressor Protocol 73 ...
Страница 78: ...Protocol Installation and Service Manual 600V Two Wide Protocol with Field supplied transformer 74 ...
Страница 81: ...Protocol Installation and Service Manual Control and Compressor Wiring PCS without Vapor Wiring 77 ...
Страница 82: ...Protocol Installation and Service Manual PCS with Vapor Wiring 78 ...
Страница 83: ...Protocol Installation and Service Manual CPC Danfoss Comtrol without Vapor Wiring 79 ...
Страница 84: ...Protocol Installation and Service Manual CPC Danfoss Comtrol with Vapor Wiring 80 ...
Страница 85: ...Protocol Installation and Service Manual Controller Wiring PCS 81 ...
Страница 86: ...Protocol Installation and Service Manual CPC 82 ...
Страница 87: ...Protocol Installation and Service Manual CPC Einstein 83 ...
Страница 88: ...Protocol Installation and Service Manual Danfoss 84 ...
Страница 89: ...Protocol Installation and Service Manual Comtrol 85 ...
Страница 99: ...Protocol Installation and Service Manual 95 ...
Страница 100: ...Protocol Installation and Service Manual 96 ...
Страница 101: ...Protocol Installation and Service Manual POWERLINK Operation 97 ...