16
Entyce Lifting and Transport Instructions
72.68
34.42
Lift Zone
J-Bar Zone
Jack Points
Dollies
under each
Base Leg
1. The Entyce can be lifted by a forklift only at the specifi ed location in the diagram
Improper placement of forks may damage
drainage piping. Use a spotter when placing forks.
Make sure that piping will not be damaged.
Use J-Bars or Jacks if Forks cannot be used safely
WARNING
2. Remove close-off s and lower body panels before lifting with a fork. Serious damage will occur if the body panels are
not removed.
• Remove the end case lower and bottom panels fi rst
• Then remove the side case lower and bottom panels
• A Phillips head screwdriver/drill is needed for lower and bottom panel removal
3. Make sure that fork spacing and width will not damage drain, piping, or electrical lines
4. Be sure that the forks are long enough to support beyond the center of the case. Check for proper balance before
moving. A minimum fork length of 36” is recommended for 68” wide cases
5. The Entyce can be raised at one end with a forklift to allow the placement of rollers or dollies. See fi gure on page 13
for J-bar and jacking instructions
6. Never drag or push the Entyce by ANY COMPONENT including ANY GLASS COMPONENT. This will result in damage
to the base, and possibly damage to other components
7. Evenly support the entire base structure on rollers or dollies before attempting to move. Each Base Leg must have
its own dollie to properly support the case.
Li• ing Instruc• ons
Содержание CHINO TY3
Страница 6: ...6 Cut and Plan Views ...
Страница 8: ...8 Spec Sheet ...
Страница 9: ...9 01 01 ...
Страница 10: ...10 0 1 0 0 1 1 1 2 0 1 ...
Страница 11: ...11 0 1 0 23 43 5 0 1 0 23 43 5 5 5 1 6 1 1 7 23 43 ...
Страница 12: ...12 0 1 23 23 1 23 23 1 0 1 4 5 0 4 6 0 4 4 4 ...
Страница 42: ...42 Controller for temperature control AK CC 210 User Guide ADAP KOOL Refrigeration control systems ...