English
15
rear retainer pins
BLOCKING TABLE FOR TRANSPORTATION (SEE FIG 3)
FOLDING THE FEET (SEE FIG 4)
TRANSPORT (SEE FIG 5)
PLACING ON FEET (SEE FIG 6)
Please read the instructions for use prior
to operating the machine for the first time.
The use of ear protection is mandatory.
The working area must be completely
cleared, well lit and all safety hazards
removed (no water or dangerous objects
in the vicinity).
Any persons not involved in the work
should leave the working area.
Use blades suitable for the work to be
done (speed, geometry, application, etc.).
The operator must wear protective
clothing appropriate to the work he is
doing. We recommend that this
includes both eye and ear protection.
Inspection before starting
5
T
-ELECTRICAL SAFETY :
Operate this machine only on a supply
equipped with a 30 mA earthed current-limi-
t i n g c i r c u i t - b r e a k e r . O t h e r w i s e ,
consult our catalogue for appropriate models.
- The RCCB must be used correctly, including tes-
ting it regularly. For tools supplied with an integral
RCCB in the cable or in the mains plug, if the
cable or plug has been damaged, repairs must be
carried out by the manufacturer, one of his agents
or by a qualified repair workshop to avoid any
risks resulting from errors.
- Make sure that the mains voltage corres-
ponds with that marked on the manufactu-
rer's plate on the machine.
- Three-phase motor
Make sure that the motor rotates in the same
direction as the arrow stamped on the casing:
if the motor does not turn in the direction
required, swap two of the supply wires.
- Use the following types of plug, single
phase 2 P + E, or 3
x
P
x
+
x
E / 3
x
P
x
+
x
N
x
+
x
E
according to the corresponding voltage.
• Tighten the nut (C)
• Refit the protective case (B).
• Tighten the 2 screw knobs (A).
Electrical connection
7
Take care about the direction of rotation which
is shown by an arrow on one of the faces.
Make sure the contact faces of flanges, of
blade and the axle are clean.
!
?
=
Disconnect the machine by unplugging the
supply cable.
• Unscrew the two handwheels (A) and remove the
housing cover (B) (SEE FIG 7).
• Unscrew the locking nut (C) using a spanner.
Fitting the disc
6
The disc locking nut has a left-hand
thread.
!
- Extension lead: Cable size sufficient for the electrical
power, connection to the mains by a H07 RNF type
cable of the following size:
- 3 x 2.5 mm
2
up to 50 m for 230 V
- 4 or 5 x 1.5 mm
2
up to 100 m for 400 V
- 3 x 4 mm
2
up to 40 m for 115 V
Always pay extreme care and attention to
the preparation of the machine before
starting up
Remove all adjustment tools and
wrenches from floor and machine
Always keep blade guard in place
• To start the machine press the green but-
ton on the switch (optional cut-out switch).
• To stop the machine, press the red button.
The protective case and the motor mounting fitted with a
deflector blade provide perfect distribution of the spray.
phase motor protected by a built-in thermal cir-
cuit breaker.
Ensure that the water supply is abundant,
when cutting wet.
Starting up
8
STOP
• Fill the water tank (maximum level is the base of the rails).
• The water pump starting is coupled with that of the motor.
As each machine is fitted with a self priming pump,
the water is sprayed onto the disc as soon as the
machine starts.
Cutting method
9
• Straight cuts
≤ 510 mm : the stop (C) prevents fingers being trap-
ped between the table and the frame (SEE FIG 8).
> 510 et ≤ 610 mm : retract the stop (C) under the
table to increase the stroke.
Содержание TS 300 E
Страница 4: ......
Страница 13: ...FIG 1 ABB 1 ...
Страница 15: ...FIG 9 ABB 9 FIG 8 1 ABB 8 1 FIG 8 2 ABB 8 2 C C FIG 7 4 ABB 7 4 A A B ...
Страница 16: ...230V ...
Страница 17: ...400V ...
Страница 55: ......
Страница 56: ...2007 03 15 www husqvarnacp com 115 03 02 20 ...