
14
Table 4. Tightening Torque Requirements (Ft. lbs.)
HH1500 HH2000 HH3600 HH4500 HH5800 HH8000
Side Rod
880 ±35
880 ±35 1100 ±35 1850 ±75 2560 ±75 3300 ±75
Valve Box
Set Bolt
280 ±20
280 ±20
330 ±20
330 ±20
590 ±35
590 ±35
Valve Cap Bolt 175 ±20
280 ±20
330 ±20
330 ±20
480 ±35
480 ±35
Mode Valve
Set Bolt
N/A
70 ±3
70 ±3
70 ±3
70 ±3
70 ±3
Bracket Bolt
400 ±35
840 ±35 1320 ±35 2600 ±35 2600 ±35 2600 ±35
Side Rod
Back Nut.
&
Mode Valve
Set Bolt
Valve Box Set Bolt
(HH1500, HH2000,
HH3600)
Valve Box Set Bolt
(HH4500, HH5800,
HH8000)
Valve Cap Bolt
(HH2000 and up)
Figure 5. Tightening Sequence
GREASING REQUIREMENTS
The hammer should be greased each startup and after every 2-3 hours of operation. The
grease nipple is located at the front cap as shown in Figure 6. Approximately 10 shots in
the front cap are recommended when the tool is at the upper limit of travel.
Figure 6. Grease Fitting
Figure 6.
1
3
4
2
5
1
3
6
2
4
7
1
3
5
2
6
4
8
4
1
3
2
5
Содержание HH1500
Страница 1: ...1 HUSKIE HYDRAULIC HAMMERS SERVICE MANUAL HH1500 HH2000 HH3600 HH4500 HH5800 HH8000...
Страница 33: ...33 9 PARTS LIST AND ILLUSTRATIONS HH1500 HH2000 HH3600 HH4500 HH5800 HH8000...
Страница 35: ...35 Effective 07 05 HH1500 HAMMER...
Страница 37: ...37...
Страница 39: ...39 HH2000 HAMMER UP TO S N 2K031 SOLD BEFORE 9 96 Effective 07 05...
Страница 41: ...41 Effective 07 05 HH2000 HAMMER S N 3K001 UP SOLD AFTER 10 96...
Страница 43: ...43...
Страница 45: ...45 HH 3600 2 HAMMER S N 5M1000 UP Effective 07 05...
Страница 47: ...47...
Страница 49: ...49 HH4500 HAMMER Effective 07 05...
Страница 51: ...51...
Страница 53: ...53 HH5800 HAMMER Effective 07 05...
Страница 55: ...55...
Страница 57: ...57 HH8000 HAMMER Effective 07 05...
Страница 59: ...59 NOTES...