INLET VALVE INSTALLATION

INLET VALVE INSTALLATION   

I

   

TABLE OF CONTENTS

Next, slightly rotate the tool counter-clockwise to the 11:30 position. This alignment will allow the 
two metal hooks on the G800 Valve Tool to pass through the two correct openings around the 
outside of the inlet valve. Press the metal hooks through the openings. Continue pressing the  
inlet valve and G800 Valve Tool together compressing the spring on the tool (FIGURE 106). While 
holding the tool down with the spring compressed, turn the tool’s handle clockwise until it stops. 
Next, release the spring’s compression by lifting the handle slightly on the G800 Valve Tool. This 
action hooks and locks the inlet valve to the tool. Check to make sure that the pointer arrow on 
the tool is directly above the communication port on the inlet valve and that the valve is securely 
hooked to the tool.

Next, insert the assembled tool, white lower snap ring and inlet valve into the rotor’s body cavity. 

To do so, it is necessary to align the pointer arrow on the G800 Valve Tool with the alignment dot 

on the rotor’s flange. The alignment dot is centered on the flange compartment lid adjacent to 

(next to) the body cavity opening (FIGURE 107). A second alignment dot is located below the lid  

in case the flange compartment lid has been removed. Align the pointer arrow on the tool with  
the alignment dot and lower the assembled tool, white lower snap ring and inlet valve into the 
rotor’s body.

As the G800 Valve Tool is lowered into the rotor’s body, recessed areas on the black plastic part on 

the tool will engage vertical rails inside the body wall (FIGURE 108). The tool must engage these 

rails or the inlet valve’s communication port will not align with the communication port in the 
body cavity below. Continue pressing the assembled tool, white lower snap ring and inlet valve 
downward into the rotor’s body. Once the tool reaches the bottom, continue pressing firming to 
securely seat the inlet valve and snap ring.

A distinct “click” sound should be heard as the 

snap ring is released and engages the snap ring 
groove in the rotor’s body cavity. After the inlet 
and white lower snap ring have been properly 
seated, press down on the tool then rotate 
counter-clockwise to disengage the tool’s  
metal hooks from the inlet valve. Next, raise  
the G800 Valve Tool out of the body. Finally, 
take whatever time is necessary to visually  
confirm that every part of the white lower snap 
ring is securely seated into the snap ring groove. 

Inlet valve installation option 2 

– The 

alternative method to installing the G800 inlet 
valve is to use the 16” Needle-Nose Pliers Tool. 
First look at the top of the inlet valve and notice 
the raised wall or rib that protrudes upward 
from the center. During installation, the 16” 
Needle-Nose Pliers Tool is used to grab this 
protruding rib on the inlet valve. Next, look 
at the side of the inlet valve and notice the 
communication port. During installation, this 

communication port must engage the 
communication port at the bottom of the rotor’s 
body cavity. Now notice that directly above the 
communication port there is a slot feature on 
the valve’s outside ring (FIGURE 109). During 
installation, this slot feature must engage the 
vertical rail of plastic located on the rotor body’s 
inside wall. The vertical rail is located directly 
above the communication port at the base of 
the rotor’s body cavity.       

Grab the protruding rib on the inlet valve firmly 
with the 16” Needle-Nose Pliers Tool. Next, insert 
the inlet valve into the rotor’s body cavity. It is 
necessary to align the valve’s communication 
port and/or the slot feature with the alignment 
dot on the rotor’s flange (FIGURE 110). The 
alignment dot is centered on the flange  
compartment lid adjacent to (next to) the  
body cavity opening. A second alignment dot 
is located below the lid in case the flange  
compartment lid has been removed.

With the valve’s communication port and/or the 
slot feature aligned to the dot on top of the rotor, 

carefully lower the inlet valve into the rotor’s 
body. If the inlet valve is properly engaged with 
the vertical rail in the body, it will not be possible 
to rotate the inlet valve. If the inlet valve can be 
rotated in either direction, pull the inlet out and 

start again. With the inlet valve engaging the 
body’s vertical rail, continue lowering the valve 
into the rotor’s body. It is important to keep the 
inlet valve vertical in order to allow the valve’s 
rock screen to enter the inlet of the body. Once 
the inlet valve reaches the bottom, continue 
pressing firming to securely seat the inlet valve.

   

   

Fig 104 

   

Fig 105 

   

   

   

Fig 106 

Fig 107 

   

   

   

Fig 106 

Fig 107 

FIGURE 106

FIGURE 107

FIGURE 108

   

   

Fig 108 

   

Fig 109 

   

   

Fig 108 

   

Fig 109 

FIGURE 109

FIGURE 110

Содержание G800 Series

Страница 1: ...GOLF IRRIGATION I Built on Innovation hunterindustries com TTS GOLF ROTOR OWNERS MANUAL...

Страница 2: ...Feature 32 Inlet Valve Removal G800 Series 33 Inlet Valve Removal G900 Series 35 Inlet Valve Servicing All Models 38 Inlet Valve Installation Safety Warnings 39 Inlet Valve Installation G800 Series 3...

Страница 3: ...thru 25 1 swing joint with 1 Acme outlet fitting G800 Series rotors with nozzles 25 thru 53 1 swing joint with 1 Acme outlet fitting G900 Series rotors with nozzles 25 thru 73 1 swing joint with 1 Acm...

Страница 4: ...AUTO position When in this position the rotor will not activate unless the controller sends 24 volts of power to the rotor s solenoid FIGURE 1 OFF Using one of the tools listed above turn the selecto...

Страница 5: ...ect the inch Control Tubing to the rotor s inch Control Tubing by pressing together at the brass fitting Finally slide the inch tube retainer towards the brass fitting to lock the tube in place Fig 4...

Страница 6: ...ng area Align the metal end of the snap ring tool to the indicator on the snap ring s rubberized wiper seal FIGURE 15 Use the palm of the other hand to drive the tool downward through the rubberized m...

Страница 7: ...ADJUSTMENT PROCEDURE G35 G75 G95 ADJUSTABLE PART CIRCLE RISERS All adjustments are initiated by inserting the small end of the T handle tool or the plastic end of the Hunter wrench into the riser s a...

Страница 8: ...is necessary to follow these steps With riser held in hand compress the riser spring by grabbing the riser seal assembly FIGURE 27 pressing downward and then hold riser firmly to prevent the spring f...

Страница 9: ...zles must be installed with the correct orientation for optimal performance Prior to removal of the short range or mid range nozzle note the differences between the nozzle on the left and right When f...

Страница 10: ...vely affected NOZZLE REPLACEMENT G95 RISERS To view and replace the nozzles it is necessary to compress the riser spring by grabbing the riser seal assembly FIGURE 37 pressing downward and then holdin...

Страница 11: ...er Seal Support is on top and its lower surface nests perfectly with the top of the riser seal The Riser Seal is the rubberized part in the middle The Lower Seal Support also known as the Upper Spring...

Страница 12: ...sp the bottom of the riser assembly Slowly release the compression of the retraction spring until it is fully extended and no pressure is felt Note the orientation of the riser components to help with...

Страница 13: ...ds and off the riser assembly Replacement face seals must fit very snug to the stainless steel on the riser As a result there may be considerable resistance when attempting to install the new face sea...

Страница 14: ...bers engraved into the plastic These numbers are the nozzle size reference numbers To make an adjustment use the blade end of the snap ring tool or a bladed screwdriver to lift the adjustable stator p...

Страница 15: ...ollow for your rotor model RISER REPLACEMENT G35 G75 G95 ADJUSTABLE PART CIRCLE RISERS Adjustable part circle risers must be inserted such that the arc setting aligns to the area to be irrigated All H...

Страница 16: ...p ring in front of you with the wiper seal facing up and the snap ring open ends at the top The snap ring end on the left must be installed first Lay the snap ring on top of the rotor and use the left...

Страница 17: ...FEATURE Caution Electric valve in head rotors are connected to pressurized main line or sub main piping This pressurized piping must be depressurized before servicing the inlet valve Serious bodily in...

Страница 18: ...nt features on the tool s black plastic part First look at the three retaining screws on top of the tool Next find the screw that has a pointer arrow engraved around the head of the screw FIGURE 81 Th...

Страница 19: ...pward to remove the white lower snap ring FIGURE 90 Once the white lower snap ring has been removed the inlet valve is released and is ready for removal G900 Series inlet valves are removed from the b...

Страница 20: ...flange compartment lid adjacent to next to the body cavity opening A second alignment dot is located below the lid in case the flange compartment lid has been removed Align the pointer arrow on the t...

Страница 21: ...tallation In order to engage the inlet valve and white lower snap ring with the G800 Valve Tool properly you must be familiar with the pointing and alignment features on the tool s black plastic part...

Страница 22: ...er clockwise to disengage the tool s metal hooks from the inlet valve Next raise the G800 Valve Tool out of the body Finally take whatever time is necessary to visually confirm that every part of the...

Страница 23: ...king caused by the use of improper lubricants are not covered under warranty G900 Series inlet valves are installed in the body using the G900 Valve Tool Prior to using the tool familiarize yourself w...

Страница 24: ...necessary to visually confirm that every part of the white lower snap ring is securely seated into the snap ring groove Caution If snap ring is not fully seated in the snap ring groove the valve may b...

Страница 25: ...ory installed flange compartment lids have a large recessed area that can be used for the application of yardage marker placards FIGURE 126 An optional flange compartment lid is available with a raise...

Страница 26: ...the tubing as it is clamped closed A leaking supply tube will cause the rotor to weep water while deactivated A tubing retainer can be used to pinch the supply tube going into the Pilot Valve Note tha...

Страница 27: ...led connectors Choose either of the Hunter DC solenoid s lead wires when making each splice as there is no specific polarity required IMPORTANT the TTS rotor s top service capabilities require that th...

Страница 28: ...ide of the Solenoid FIGURE 137 This flat is used as a reference when connecting the Solenoid to the Pilot Valve Next notice there is also a flat section along the side of the Pilot Valve at a point op...

Страница 29: ...he rotor s nozzles Since the amount of flow through the nozzles is affected by pressure supplying a consistent pressure to every rotor in the irrigation system is beneficial This will help to ensure t...

Страница 30: ...that the water discharged from the valve circuitry is vented into the rotor s body and then out the nozzles To replace the Pressure Regulator use side cutters or blade to make clean cuts in the tubin...

Страница 31: ...e 2014 Hunter Industries Incorporated Please recycle GLIT 071 A 4 14 This brochure was printed on Forest Stewardship Council FSC certified paper with soy inks The FSC is an international organization...

Отзывы: