30
Filling the Hydraulic Pistons
Turn the FLOW VALVE on the CELL PRESSURE Chamber (Left side) so
that it is OPEN (pointing up), see photo below.
2. Ensure that the RELIEF VALVE on the top of the CELL PRESSURE
Chamber (left side) is closed
(circled in Red below)
. Also, ensure
that the lines running from the water source and the HM-5250
have b een purged of air before connecing them to the input port
on the HM-5250.
Содержание HM-5250.3F
Страница 1: ...product manual 03 20 Hydraullic Pressure Controller HM 5250 3F ...
Страница 21: ......
Страница 22: ...22 ...
Страница 23: ...Equipment Setup 23 ...
Страница 28: ...28 ...
Страница 29: ...29 Test Setup 29 ...
Страница 39: ...39 ...