35
6. Open the CELL VALVE (center valve) on the Triaxial Cell.
7. Input 3 psi for BASE PRESSURE in the yellow PSI Field on the
touch screen of the HM-5250, and then, Press the corresponding
green START BUTTON, (see photo below).
8. Open the BASE VALVE (valve to the right of the center valve)
on the Triaxial Cell.
9. Once both lines have been purged of air press the stop
buttons on the touch screen, close the valves on the Triaxial
chamber, and close the control valves on the HM-5250.
Содержание HM-5250.3F
Страница 1: ...product manual 03 20 Hydraullic Pressure Controller HM 5250 3F ...
Страница 21: ......
Страница 22: ...22 ...
Страница 23: ...Equipment Setup 23 ...
Страница 28: ...28 ...
Страница 29: ...29 Test Setup 29 ...
Страница 39: ...39 ...