background image

 

9

OPERATING INSTRUCTIONS

 

 
To Start up a Hot Stove

 

If the stove is warm at re-start, the On/Off button must be pressed down and held for 2 
seconds or more until the Heat Level light is lit.   
 
 
When first starting a new pellet stove, or when you completely empty the hopper of 
pellets, you can press and hold the AUGER button to get the pellets into the burn pot 
quicker.  See AUGER button description on page 10. 
 
The convection air flow will change in accordance with the heat setting.  Convection air 
flow is at maximum when the heat setting is at maximum.  Air flow will be at a minimum 
when the heat setting is at a minimum.  If the user wishes to turn the convection fan on 
maximum, at any heat setting, they may do so by pressing the FAN button. 
 
If the flame goes out, or the heat output is too high on minimum heat level setting, use the 
AUGER TRIM button to make adjustments.  See the AUGER TRIM button description 
on page 11. 

 
To Shutdown Stove

 

 
Turn off the unit by pressing the On/Off button.  The stove will enter the shutdown cycle 
where the pellets will stop feeding to allow the fuel in the burn pot to be used up.  The 
exhaust blower and convection fan will continue to operate until the flames are out and 
the unit has cooled down.  Once this has been accomplished the stove will shut down 
completely. 
 
In the AUTO mode the turning the thermostat all the way down can also be used to turn 
off the stove. 
 

DO NOT TURN OFF THE UNIT BY DISCONNECTING THE ELECTRICAL 
POWER TO THE UNIT.  THIS WILL CAUSE THE UNIT TO MISS THE 
PROPER SHUTDOWN CYCLE, CAUSING THE RELEASE OF SMOKE INTO 
THE HOUSE AND OVERHEATINGOF THE STOVE. 

Содержание Saranac Free Standing

Страница 1: ...before installation and use of this pellet fuel burning room heater Failure to follow these instructions could result in property damage bodily injury or even death Contact your local building offici...

Страница 2: ...ns 8 11 Thermostat Installation 12 Clearances to Combustibles 13 14 Installing Your Room Heater 15 23 Mobile Home Installations 24 Insert Pellet Stove 25 27 Vent Termination Locations 28 Maintenance 2...

Страница 3: ...ium grade 3 maximum Standard grade Moisture Content 8 maximum Heat Content minimum 8 200 btu hr It is important to note that the ash content of the fuel and frequency of operation determine the freque...

Страница 4: ...utside combustion air source It is recommended that the exhaust vent be cleaned bi annually or after every two tons of pellets Soot or creosote may accumulate when the stove is operated under incorrec...

Страница 5: ...restrictions or inspection requirements in your area Notify your insurance company of your new stove Allow the stove to cool before performing any maintenance Ashes must be disposed of in a metal cont...

Страница 6: ...6 SPECIFICATIONS Heating Specifications Burn Rate 50 000 btu hr or 4 8 lbs of fuel per hour Hopper Capacity 50 lbs Depends on quality and heating value of pellet fuel DIMENSIONS Figure 1...

Страница 7: ...7 DIMENSIONS The minimum installation dimensions of the insert opening are 32 813 mm wide x 22 3 4 578 mm high x 12 1 4 311 mm deep Figure 2...

Страница 8: ...tove switch it to manual mode so you can have full control of the pellet stoves control board functions and familiarize yourself with how the pellet stove works It is in this mode that the heat level...

Страница 9: ...ay do so by pressing the FAN button If the flame goes out or the heat output is too high on minimum heat level setting use the AUGER TRIM button to make adjustments See the AUGER TRIM button descripti...

Страница 10: ...nto the burn pot The electric ignition system will be automatically activated flames in the burn pot will normally appear between 3 7 minutes Once the flame has been established the start up cycle wil...

Страница 11: ...actory setting and works for most types of fuel Figure 3 Control Panel Open Door If the door is opened while the unit is operating it must be closed within 30 seconds or the unit will go into vacuum e...

Страница 12: ...t Disconnect unit from power supply Open right side panel to gain access to rear of control panel Take the thermostat wires and connect to the green screw terminal on the rear of the control panel see...

Страница 13: ...on a combustible floor a 1 2 thick non combustible hearth pad must be installed under the unit The pad must extend at least the width of the appliance and at least the depth of the appliance plus 6 15...

Страница 14: ...imney The chimney must be lined if over 6 150 mm in diameter or if it has a cross sectional area of over 28 square inches Venting can pass through the ceiling and roof if listed pipe is used Do not ob...

Страница 15: ...ustion Be sure that the outside air vent has a proper cap on it to prevent rodents from entering and also is installed where it won t become blocked with snow etc 8 Connect the exhaust vent pipe to th...

Страница 16: ...16 HORIZONTAL EXHAUST VENT INSTALLATION continued Figure 8 Figure 9...

Страница 17: ...r with the same spot on your exterior wall and cut a hole 2 1 2 64 mm in diameter through the wall 5 Secure all vent joint connections with 3 screws Seal the exhaust vent joint connections with high t...

Страница 18: ...exhaust vent through the wall be sure to make sure that 3 75 mm clearances to combustibles are maintained 5 Secure all vent joint connections with 3 screws Seal the exhaust vent joint connections wit...

Страница 19: ...19 SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET APPLIANCES Images courtesy of Selkirk...

Страница 20: ...20 SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET APPLIANCES Images courtesy of Selkirk UP OUT HORIZONTAL TERMINATION KIT Figure 12...

Страница 21: ...21 SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET APPLIANCES Images courtesy of Selkirk STRAIGHT OUT HORIZONTAL TERMINATION KIT Figure 13...

Страница 22: ...22 SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET APPLIANCES Images courtesy of Selkirk THROUGH THE ROOF VERTICAL TERMINATION KIT Figure 14...

Страница 23: ...sure that the unit is permanently electrically grounded to the chassis of your home IT IS MANDATORY TO TAKE THE COMBUSTION AIR FROM THE OUTSIDE WHEN INSTALLING THIS UNIT IN AIR TIGHT OR MANUFACTURED M...

Страница 24: ...e shroud must be installed before unit is set into its final position Step 1 Shroud Side Facing the back of the unit take the left shroud side piece no control panel hole and fasten as shown with 2 sc...

Страница 25: ...e the top shroud side piece and fasten as shown with 4 screws provided Step 4 Control Board Take the control board and insert it from the back of the right shroud side facing front of unit Fasten cont...

Страница 26: ...xhaust fan and the either a 90 elbow or a clean out tee with cap The air intake can be attached to the appliance by using a hose clamp 6 Connect the stove to the coupling on the bottom of the exhaust...

Страница 27: ...F 12 30 cm To outside corner G 12 30 cm To inside corner combustible wall H 3 91 cm within a height of 15 4 5 m above the meter regulator assembly To each side of center line extended above natural g...

Страница 28: ...rn pot Inspect the burn pot regularly to check that the holes have not become plugged If necessary clean thoroughly It is imperative that the burn pot be re installed the correct way or the unit will...

Страница 29: ...r shop vac may have a special filter or bag available to eliminate this leakage 5 Remove ash pan and dispose of ashes into metal container 6 Reinstall ash pan 7 Reinstall burn pot and burn pot liner A...

Страница 30: ...ONNECT POWER BEFORE SERVICING UNIT Over time ash or dust may accumulate on the blades of the convection combustion fans The fans should be inspected periodically and if any accumulation is present vac...

Страница 31: ...d To clean the chimney detach the vent where it attaches to the combustion blower If creosote has accumulated it should be removed Inspect the entire vent system from unit exhaust to termination Creos...

Страница 32: ...an optional firebox decorative liner as well as a ceramic log set Decorative Liner Installation 1 Install the center panel be sure to line up the hole with the drop tube 2 Install the left and right p...

Страница 33: ...m in the firebox Check the vacuum switch by shorting out the vacuum switch then turn the control panel to OFF and back to ON If the unit starts to operate change the vacuum switch Check the exhaust te...

Страница 34: ...r if none check circuit board fuse Ensure the exhaust blower is operating Check the vacuum hose is connected or damaged Bypass the vacuum switch by placing a jumper wire on the two electrical connecti...

Страница 35: ...burn pot liner be sure to follow instructions for disposal of ashes found on page 30 Circuit board malfunction Time the fuel feed light at each setting after the stove has completed the initial Start...

Страница 36: ...36 WIRING DIAGRAM...

Страница 37: ...iding the Warranty Item Part control panel circuit board DHC3000 REV DSVH3001 auger motor 250 F normally open high limit snap disc 611240 140 F normally open exhaust temperature snap disc X 2269F conv...

Страница 38: ...rized Inca Metal dealer and is subject to the following conditions and limitations This factory warranty is nontransferable and may not be extended whatsoever by any of our representatives A licensed...

Страница 39: ...r assumes nor authorizes any third party to assume on its behalf any other liabilities with respect to the sale of this product Inca Metal will not be responsible for over firing downdrafts spillage c...

Отзывы: