background image

 

26

INSERT PELLET STOVE

 (continued) 

 

Installation into a Masonry Fireplace: 

1.  Have the masonry chimney inspected by a certified 
chimney sweep or installer to determine its structural 
condition. 
2.  Determine the amount of venting required to reach 
the top of the chimney and then add 14” to ensure the 
termination is an adequate distance above the roofline. 
3.  The first 5’ of your exhaust vent will be Simpson 
Dura Vent pellet stove flex vent the remainder will be 
rigid pipe.  For each joint subtract 1-1/2” to allow for 
the overlap.  You may need an adjustable length 
section to achieve the correct height.  The air intake 
may be 2” aluminum flex vent. 
4.  Assemble the first rigid section (of the exhaust 
pipe) to the pellet stove flex vent insuring that the 
“UP” arrows shown on the pipe labels are pointing up.  
Push the sections together and twist to lock.  Repeat 
the process for the remainder of the pipe sections and 
lower the assembly down the chimney.  Lower the 
intake and exhaust pipes below their normal position 
in order to connect the to the back of the appliance.  It 
may be necessary to tie a line to the top section, of 
venting, to pull it back up to the correct position after. 
5.  In order to connect to the exhaust of the stove you 
will need to install a pipe adapter to the exhaust fan 
and the either a 90º elbow or a clean out tee with cap.  
The air intake can be attached, to the appliance, by 
using a hose clamp. 
6.  Connect the stove to the coupling on the bottom of 
the exhaust flex vent and twist to the locked position.  
Push the appliance into the fireplace to its final 
position.  Go to the top of the chimney and pull the 
vent system up to the desired height. 
7.  For the exhaust termination of the pellet vent use a 
tall cone flashing and a storm collar.  This requires 
14” of pipe above the top of the masonry chimney.  
Pull the pipe up through the flashing to the desired 
height and mark where the storm collar will go.  Slip 
the storm collar down over the pipe and fasten it to the 
pipe with a 1/4” stainless steel sheet metal screw.  The 
storm collar will then support the entire exhaust vent 
system.   
8.  To install the air intake vent through the chimney 
cap you may cut a hole and install cap as shown or 
attach air intake vent to a flashing and cap.  The 
chimney top must be properly sealed to prevent rain 
and or snow from entering the chimney. 
9.  Install the cap and seal around the joint of the 
storm collar and any other joints that are visible. 
10.  This completes the masonry chimney installation.  

 

 

Exhaust Cap 

Air Inlet 

Rigid Vent Pipe

Flexible Exhaust  
Vent 

Damper Removed or 
Fastened Open (for 
Canada) or sealed off 
(United States)  

Steel Plate or Flashing

Mantle

Minimum 6” (150 mm) non-
combustible Floor Protection 

90º elbow or clean out Tee 

Figure 20 

Содержание Saranac Free Standing

Страница 1: ...before installation and use of this pellet fuel burning room heater Failure to follow these instructions could result in property damage bodily injury or even death Contact your local building offici...

Страница 2: ...ns 8 11 Thermostat Installation 12 Clearances to Combustibles 13 14 Installing Your Room Heater 15 23 Mobile Home Installations 24 Insert Pellet Stove 25 27 Vent Termination Locations 28 Maintenance 2...

Страница 3: ...ium grade 3 maximum Standard grade Moisture Content 8 maximum Heat Content minimum 8 200 btu hr It is important to note that the ash content of the fuel and frequency of operation determine the freque...

Страница 4: ...utside combustion air source It is recommended that the exhaust vent be cleaned bi annually or after every two tons of pellets Soot or creosote may accumulate when the stove is operated under incorrec...

Страница 5: ...restrictions or inspection requirements in your area Notify your insurance company of your new stove Allow the stove to cool before performing any maintenance Ashes must be disposed of in a metal cont...

Страница 6: ...6 SPECIFICATIONS Heating Specifications Burn Rate 50 000 btu hr or 4 8 lbs of fuel per hour Hopper Capacity 50 lbs Depends on quality and heating value of pellet fuel DIMENSIONS Figure 1...

Страница 7: ...7 DIMENSIONS The minimum installation dimensions of the insert opening are 32 813 mm wide x 22 3 4 578 mm high x 12 1 4 311 mm deep Figure 2...

Страница 8: ...tove switch it to manual mode so you can have full control of the pellet stoves control board functions and familiarize yourself with how the pellet stove works It is in this mode that the heat level...

Страница 9: ...ay do so by pressing the FAN button If the flame goes out or the heat output is too high on minimum heat level setting use the AUGER TRIM button to make adjustments See the AUGER TRIM button descripti...

Страница 10: ...nto the burn pot The electric ignition system will be automatically activated flames in the burn pot will normally appear between 3 7 minutes Once the flame has been established the start up cycle wil...

Страница 11: ...actory setting and works for most types of fuel Figure 3 Control Panel Open Door If the door is opened while the unit is operating it must be closed within 30 seconds or the unit will go into vacuum e...

Страница 12: ...t Disconnect unit from power supply Open right side panel to gain access to rear of control panel Take the thermostat wires and connect to the green screw terminal on the rear of the control panel see...

Страница 13: ...on a combustible floor a 1 2 thick non combustible hearth pad must be installed under the unit The pad must extend at least the width of the appliance and at least the depth of the appliance plus 6 15...

Страница 14: ...imney The chimney must be lined if over 6 150 mm in diameter or if it has a cross sectional area of over 28 square inches Venting can pass through the ceiling and roof if listed pipe is used Do not ob...

Страница 15: ...ustion Be sure that the outside air vent has a proper cap on it to prevent rodents from entering and also is installed where it won t become blocked with snow etc 8 Connect the exhaust vent pipe to th...

Страница 16: ...16 HORIZONTAL EXHAUST VENT INSTALLATION continued Figure 8 Figure 9...

Страница 17: ...r with the same spot on your exterior wall and cut a hole 2 1 2 64 mm in diameter through the wall 5 Secure all vent joint connections with 3 screws Seal the exhaust vent joint connections with high t...

Страница 18: ...exhaust vent through the wall be sure to make sure that 3 75 mm clearances to combustibles are maintained 5 Secure all vent joint connections with 3 screws Seal the exhaust vent joint connections wit...

Страница 19: ...19 SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET APPLIANCES Images courtesy of Selkirk...

Страница 20: ...20 SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET APPLIANCES Images courtesy of Selkirk UP OUT HORIZONTAL TERMINATION KIT Figure 12...

Страница 21: ...21 SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET APPLIANCES Images courtesy of Selkirk STRAIGHT OUT HORIZONTAL TERMINATION KIT Figure 13...

Страница 22: ...22 SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET APPLIANCES Images courtesy of Selkirk THROUGH THE ROOF VERTICAL TERMINATION KIT Figure 14...

Страница 23: ...sure that the unit is permanently electrically grounded to the chassis of your home IT IS MANDATORY TO TAKE THE COMBUSTION AIR FROM THE OUTSIDE WHEN INSTALLING THIS UNIT IN AIR TIGHT OR MANUFACTURED M...

Страница 24: ...e shroud must be installed before unit is set into its final position Step 1 Shroud Side Facing the back of the unit take the left shroud side piece no control panel hole and fasten as shown with 2 sc...

Страница 25: ...e the top shroud side piece and fasten as shown with 4 screws provided Step 4 Control Board Take the control board and insert it from the back of the right shroud side facing front of unit Fasten cont...

Страница 26: ...xhaust fan and the either a 90 elbow or a clean out tee with cap The air intake can be attached to the appliance by using a hose clamp 6 Connect the stove to the coupling on the bottom of the exhaust...

Страница 27: ...F 12 30 cm To outside corner G 12 30 cm To inside corner combustible wall H 3 91 cm within a height of 15 4 5 m above the meter regulator assembly To each side of center line extended above natural g...

Страница 28: ...rn pot Inspect the burn pot regularly to check that the holes have not become plugged If necessary clean thoroughly It is imperative that the burn pot be re installed the correct way or the unit will...

Страница 29: ...r shop vac may have a special filter or bag available to eliminate this leakage 5 Remove ash pan and dispose of ashes into metal container 6 Reinstall ash pan 7 Reinstall burn pot and burn pot liner A...

Страница 30: ...ONNECT POWER BEFORE SERVICING UNIT Over time ash or dust may accumulate on the blades of the convection combustion fans The fans should be inspected periodically and if any accumulation is present vac...

Страница 31: ...d To clean the chimney detach the vent where it attaches to the combustion blower If creosote has accumulated it should be removed Inspect the entire vent system from unit exhaust to termination Creos...

Страница 32: ...an optional firebox decorative liner as well as a ceramic log set Decorative Liner Installation 1 Install the center panel be sure to line up the hole with the drop tube 2 Install the left and right p...

Страница 33: ...m in the firebox Check the vacuum switch by shorting out the vacuum switch then turn the control panel to OFF and back to ON If the unit starts to operate change the vacuum switch Check the exhaust te...

Страница 34: ...r if none check circuit board fuse Ensure the exhaust blower is operating Check the vacuum hose is connected or damaged Bypass the vacuum switch by placing a jumper wire on the two electrical connecti...

Страница 35: ...burn pot liner be sure to follow instructions for disposal of ashes found on page 30 Circuit board malfunction Time the fuel feed light at each setting after the stove has completed the initial Start...

Страница 36: ...36 WIRING DIAGRAM...

Страница 37: ...iding the Warranty Item Part control panel circuit board DHC3000 REV DSVH3001 auger motor 250 F normally open high limit snap disc 611240 140 F normally open exhaust temperature snap disc X 2269F conv...

Страница 38: ...rized Inca Metal dealer and is subject to the following conditions and limitations This factory warranty is nontransferable and may not be extended whatsoever by any of our representatives A licensed...

Страница 39: ...r assumes nor authorizes any third party to assume on its behalf any other liabilities with respect to the sale of this product Inca Metal will not be responsible for over firing downdrafts spillage c...

Отзывы: