Seite
7
von
40
Soil class 5 : ground with soil class 3 and 4 with big portion of stones
(portion > 30% with bigger diameter of 63 mm grain size).
In case of sandy and soft soils, the surface measure of foundations have to be
enlarged for about 50%!
10.
Assembly time, once foundations completed: 7 hours.
Required assistants: 3 persons.
11.
Any spare parts which may be required can be obtained directly from
your supplier.
12.
We hereby confirm that this item of play equipment has been tested and
certified in accordance with the play equipment standard EN
1176.
Содержание Eagles Nest Tree
Страница 10: ...Seite 10 von 40 Pos Quantity Symbol 5 1 6 1 101 12 102 12 103 8 104 8 105 8 106 24 107 8 108 2 109 8...
Страница 11: ...Seite 11 von 40 Pos Quantity Symbol 110 1 112 1 113 2 sets 1 sewer pipr 250 mm 0 85 m long from the customer...
Страница 13: ...Seite 13 von 40 4 Installation...
Страница 14: ...Seite 14 von 40 Foundation sizes...
Страница 15: ...Seite 15 von 40 Foundation plan...
Страница 16: ...Seite 16 von 40...
Страница 17: ...Seite 17 von 40 Foundation depths Play component alignment 7 7 6 5 3 2 8...
Страница 18: ...Seite 18 von 40 Installation...
Страница 19: ...Seite 19 von 40...
Страница 20: ...Seite 20 von 40...
Страница 21: ...Seite 21 von 40...
Страница 22: ...Seite 22 von 40 5 3 4 2 1 110 0 3 3 WH MMNS...
Страница 23: ...Seite 23 von 40...
Страница 24: ...Seite 24 von 40 2 2...
Страница 28: ......
Страница 29: ...Seite 29 von 40 B Maintenance Instructions Eagles Nest Tree Art 4652 40...
Страница 39: ......