5 Post installation checks
If the equipment has not been installed safely, you must ensure that the
public is prevented from using it.
5.1
Marking filler depth
•
Labelling the posts to show the depth of material provided as fall protection
(i.e. loose filler).
5.2
The equipment has not been installed safely in the following cases:
•
Installation of equipment is not complete.
•
The protective surface has not been installed yet.
•
Appropriate maintenance work cannot guarantee operational safety.
5.3
Removal of all assembly aids
•
Please make sure that all assembly aids have been removed from the
playing area. The equipment must not be approved for use until this check
has been carried out.
5.4
Information about inspection of the equipment before it is used for the
first time
•
There are no special inspection requirements to be met before the
equipment is used for the first time.
5.5
Retighten bolts
•
After one week of play, please retighten all bolts again. Later upon
respective maintenance.
Содержание Eagles Nest Tree
Страница 10: ...Seite 10 von 40 Pos Quantity Symbol 5 1 6 1 101 12 102 12 103 8 104 8 105 8 106 24 107 8 108 2 109 8...
Страница 11: ...Seite 11 von 40 Pos Quantity Symbol 110 1 112 1 113 2 sets 1 sewer pipr 250 mm 0 85 m long from the customer...
Страница 13: ...Seite 13 von 40 4 Installation...
Страница 14: ...Seite 14 von 40 Foundation sizes...
Страница 15: ...Seite 15 von 40 Foundation plan...
Страница 16: ...Seite 16 von 40...
Страница 17: ...Seite 17 von 40 Foundation depths Play component alignment 7 7 6 5 3 2 8...
Страница 18: ...Seite 18 von 40 Installation...
Страница 19: ...Seite 19 von 40...
Страница 20: ...Seite 20 von 40...
Страница 21: ...Seite 21 von 40...
Страница 22: ...Seite 22 von 40 5 3 4 2 1 110 0 3 3 WH MMNS...
Страница 23: ...Seite 23 von 40...
Страница 24: ...Seite 24 von 40 2 2...
Страница 28: ......
Страница 29: ...Seite 29 von 40 B Maintenance Instructions Eagles Nest Tree Art 4652 40...
Страница 39: ......