Seite
36
von
40
10 Monthly maintenance
10.1 Check the spaces between the equipment and the ground (clearance and
height of fall).
10.2 Check the ground surface of fall protection for hard objects and loose
foundations.
10.3 Check all connecting elements and fittings for wear and tear and tighten
if necessary. Replace damaged or missing parts.
10.4 Check that moving metal parts (joints, springs, etc.) move smoothly and
are not worn. Replace if necessary. It is not necessary to lubricate joints
as we only use maintenance-free metal roller bearings.
10.5 Check all attachments such as chains, ropes, nets, etc. for damage and
replace if necessary.
10.6 Check rubber parts, sleeves, etc. for wear and tear or damage and
replace if necessary.
10.7 If necessary, remove excess padding material from the post footings due
to danger of rotting.
10.8 Check the surface of wooden parts for damage caused by the weather or
external influences and mould. Repair or replace if necessary.
10.9 Check the surface of plastic and metal parts, e.g. slides, for damage and
replace if necessary.
11 Quarterly maintenance
11.1 Detailed inspection of the operation and stability of the equipment
paying particular attention to any wear and tear.
11.2 Tighten all forms of attachment.
11.3 Repaint and retreat surfaces.
11.4 Maintenance of fall protection surfaces.
11.5 Lubrication of joints.
11.6 Check height of fall protection material and top up with loose filler if
necessary. If the posts are labelled, top up to the mark.
11.7 Retighten all bolts.
12 Half yearly maintenance
12.1 The stability of supporting posts, supports, foundations etc. has to be
checked. The safety level of the entire system has to be checked after
repairs have been carried out or additional system components have
been installed or replaced.
Содержание Eagles Nest Tree
Страница 10: ...Seite 10 von 40 Pos Quantity Symbol 5 1 6 1 101 12 102 12 103 8 104 8 105 8 106 24 107 8 108 2 109 8...
Страница 11: ...Seite 11 von 40 Pos Quantity Symbol 110 1 112 1 113 2 sets 1 sewer pipr 250 mm 0 85 m long from the customer...
Страница 13: ...Seite 13 von 40 4 Installation...
Страница 14: ...Seite 14 von 40 Foundation sizes...
Страница 15: ...Seite 15 von 40 Foundation plan...
Страница 16: ...Seite 16 von 40...
Страница 17: ...Seite 17 von 40 Foundation depths Play component alignment 7 7 6 5 3 2 8...
Страница 18: ...Seite 18 von 40 Installation...
Страница 19: ...Seite 19 von 40...
Страница 20: ...Seite 20 von 40...
Страница 21: ...Seite 21 von 40...
Страница 22: ...Seite 22 von 40 5 3 4 2 1 110 0 3 3 WH MMNS...
Страница 23: ...Seite 23 von 40...
Страница 24: ...Seite 24 von 40 2 2...
Страница 28: ......
Страница 29: ...Seite 29 von 40 B Maintenance Instructions Eagles Nest Tree Art 4652 40...
Страница 39: ......