Abreviations for Eagles Nest Tree  

View 

AB 

Setting time at least 7-8 days 

Concrete  C25/30 (for foundations) 

D.be. 

Fill in around the central mast with concrete. 
(between drainage tube and central mast) 

Dt. 

Detail view 

FR 

Foundation round-off radius at least 10 cm 

Drainage layer 

ek

 

Shorten connection chains to tight fit 

KN 

Sewer pipe above groundlevel 

Fall protection 

O.K 

Upper edge of playing level 

PS 

Safety area  

Fixation rod for anker chains must be provided by customer 

VO 

Preassembled 

SSch 

After installing and and aligning Pos.3 all bolts must be 
tightened. 

      

      

 

Position the netting and foundation

 

 

Round off foundation edges (min.R = 100 mm)! Sizes of 
fundations are designed for soils class 

“4-5” (natural 

ground). 
Soil class 4: soft to medium plasticity, interleave bound, 
with minor portion of stone (portion < 30% with bigger 
diameter of 63 mm grain size). 
Soil class 5 : ground with soil class 3 and 4 with big 
portion of stones (portion > 30% with bigger diameter of 
63 mm grain size). 
In case of sandy and soft soils, the surface measure of 
foundations have to be enlarged for about 50%!

 

 

See drawings for details of shortcuts

 

Содержание Eagles Nest Tree

Страница 1: ...Eagles Nest Tree Art No 4652 40 Height 5 74 m Required Safety Surfacing 400 mm Rubber Wood Chip Pea Gravel etc Operator _____________________________________________________ Location ________________...

Страница 2: ...2 von 40 Revision history Revision 0 2014 02 07 The first allowed version Assembly Instructions Revision 5 2019 01 21 Zwei Ketten hinzu f r Leiter FH All rights reserved Copyright 2014 Huck Seiltechni...

Страница 3: ...4 Installation 13 5 Post installation checks 27 B Maintenance Instructions Eagles Nest Tree 29 Art 4652 40 29 6 Introduction Maintenance 31 7 General maintenance information 32 8 Maintenance timetable...

Страница 4: ...sitate to call your supplier if you have any problems during installation or in case of any other questions Following installation complete assembly instructions maintenance instructions and a mainten...

Страница 5: ...articles which are serving for the further development of our articles and are reasonable for the customer Measurement tolerances Because of the properties and characteristics of the components minor...

Страница 6: ...manufacturer 6 Name and overall dimension of the largest component 1x Steel post length 6 20m 193 7 mm 7 Name and weight of the heaviest component 1x Steel post approx 157 kg 8 Intended age group 6 y...

Страница 7: ...e surface measure of foundations have to be enlarged for about 50 10 Assembly time once foundations completed 7 hours Required assistants 3 persons 11 Any spare parts which may be required can be obta...

Страница 8: ...connection parts 101 12 Bowed shackles 8mm 102 12 Foundation chains 7mm x 700mm 103 8 Nyloc nuts Washers Nut caps M12 104 8 Stainless steel bearing adapter M12 105 8 Post caps 140mm 106 24 Post cap sc...

Страница 9: ...Seite 9 von 40 3 2 In symbols Table 3 2 Delivery contents in symbols Pos Quantity Symbol 1 1 2 1 3 1 4 8...

Страница 10: ...Seite 10 von 40 Pos Quantity Symbol 5 1 6 1 101 12 102 12 103 8 104 8 105 8 106 24 107 8 108 2 109 8...

Страница 11: ...Seite 11 von 40 Pos Quantity Symbol 110 1 112 1 113 2 sets 1 sewer pipr 250 mm 0 85 m long from the customer...

Страница 12: ...Seite 12 von 40 Loctite Thread locking adhesive Glue all screws nuts and sleeves with Loctite not less than 5 drops except for Nylock nuts...

Страница 13: ...Seite 13 von 40 4 Installation...

Страница 14: ...Seite 14 von 40 Foundation sizes...

Страница 15: ...Seite 15 von 40 Foundation plan...

Страница 16: ...Seite 16 von 40...

Страница 17: ...Seite 17 von 40 Foundation depths Play component alignment 7 7 6 5 3 2 8...

Страница 18: ...Seite 18 von 40 Installation...

Страница 19: ...Seite 19 von 40...

Страница 20: ...Seite 20 von 40...

Страница 21: ...Seite 21 von 40...

Страница 22: ...Seite 22 von 40 5 3 4 2 1 110 0 3 3 WH MMNS...

Страница 23: ...Seite 23 von 40...

Страница 24: ...Seite 24 von 40 2 2...

Страница 25: ...tics of wood it is normal that shrinking and swelling occur due to heat and moisture For example a wood post with a of 180mm can vary between 173mm and 183mm In occurrence it is necessary that bolts a...

Страница 26: ...must be provided by customer VO Preassembled SSch After installing and and aligning Pos 3 all bolts must be tightened Position the netting and foundation Round off foundation edges min R 100 mm Sizes...

Страница 27: ...e surface has not been installed yet Appropriate maintenance work cannot guarantee operational safety 5 3 Removal of all assembly aids Please make sure that all assembly aids have been removed from th...

Страница 28: ......

Страница 29: ...Seite 29 von 40 B Maintenance Instructions Eagles Nest Tree Art 4652 40...

Страница 30: ...von 40 Revision history Revision 0 2014 02 07 The first allowed version Maiantanance Instructions Revision 5 2019 01 21 Zwei Ketten hinzu f r Leiter FH All rights reserved Copyright 2014 Huck Seiltech...

Страница 31: ...iece of play equipment that is inspected regularly cannot become so damaged that it is dangerous Any spare parts which may be required can be obtained directly from your supplier This equipment should...

Страница 32: ...occur when the nuts are tightened To prevent this it is necessary to spray the nuts and bolts with Teflon spray or another similar lubricant 7 4 Spare parts All spare parts must conform to the manufac...

Страница 33: ...ipment use Use of the equipment should be prevented in the event of incomplete installation disassembly maintenance repairs and faults 7 12 Claims liability for faults steel poles Steel posts and foot...

Страница 34: ...at more frequent inspections and or maintenance are required if the play equipment is subject to intensive use 8 1 3 Faults that compromise safety In the event of a fault that compromises safety quick...

Страница 35: ...Seite 35 von 40 9 Regular maintenance 11 3 12 1 13 1 13 2 10 8 11 3 10 3 10 6 11 1 11 2 11 7 10 3 10 6 11 1 11 2 11 7 10 1 10 2 11 6...

Страница 36: ...t footings due to danger of rotting 10 8 Check the surface of wooden parts for damage caused by the weather or external influences and mould Repair or replace if necessary 10 9 Check the surface of pl...

Страница 37: ...decay and corrosion It may be necessary to dig out or excavate certain components in order to do so Zinc paint should be applied to corroded areas and scratches The equipment must be inspected by some...

Страница 38: ..._________________________________________________________________ Customer or operator _____________________________________________________________________________ Town Town council Kindergarten Date...

Страница 39: ......

Страница 40: ...________ ______________________________________________________________ Competent person in charge ______________________________________________________________ ______________________________________...

Отзывы: