background image

HUCK Seiltechnik GmbH  • Dillerberg 3 • D-35614 Asslar-Berghausen 

[email protected]

 - 

www.huck.net

 

 

 

Datasheet Spider,  Art. No. 5000-6-6 

 

1.  Component zone:11.30 m x 9.80 m 

Impact area:11,56 m x 11,70 m 

Installation zone:15,90 m x 14,65 m 

(greater than impact area)

 

Total ground height: 6.22 m 

Free height of fall: 1.60 

The Images (individual drawings) are not to scale !! 

2. 

Required safety surface:

 

 

 

Surface material 

Description 
mm 

Minimum thickness 
of layer mm 

Maximum height  
of fall mm 

 

Topsoil grass 

 

 

<= 1000 

 

Chipped bark 

20 – 80 grain size 

300 

400 

<= 2000 

<= 3000 

 

Wood chippings 

5 – 30 grain size 

300 

400 

<= 2000 

<= 3000 

 

Sand 

0,2 – 2 grain size 

300 

400 

<= 2000 

<= 3000 

 

Gravel 

2 – 8 grain size 

300 
400 

<= 2000 
<= 3000 

 

Other ground  
materials 

As recommended  
by manufacturer 

 

Critical fall height  
as checked 

 

Name and overall dimension of the largest component:

 

Steel post, length 7.22 m, Ø 193.7 mm (210 kg) 

Name and weight of the heaviest component: 

Steel post, 181 kg 

Intended age group: 

6 years and over

 

 

 

Please note that this equipment is set in concrete.

 

Concrete: C25/30 
Required concrete: 12,7 m

3

 

(All foundations must be brought to equal level!)

 

Foundations 

6 x 1.70 m long x 1.70 m wide, total depth 0.70 m 
1 x 1.20 m long x 1.20 m wide, total depth 0.60 m 

area to be excavated: 

6 x 1.70 m long x 1.70 m wide, total depth 1.20 m  
1 x 1.20 m long x 1.20 m wide, total depth 1.10 m including 10 cm drainage 

 

Foundation edges must be rounded off (min.R = 100 mm)! 
Sizes of fundations are designed for soils class“4-5” (natural ground). 
Soil class 3: 

Non-cohesive  to  low-cohesive  plasticity,  sand,  gravel  and  sand-gravel-
mixtures,  with  very  low  portion  of  stones  portion  of  stones  (portion  >  30% 
with bigger dia-meter of 63 mm grain size) 

Soil class 4: 

soft to medium plasticity, interleave bound, with minor portion of stone (por-
tion < 30% with bigger diameter of 63 mm grain size) 

Soil class 5: 

Soil  class  5:  ground  with  soil  class  3  and  4  with  big  portion  of  stones  
(portion > 30% with bigger diameter of 63 mm grain size) 

IN CASE OF SANDY AND SOFT SOILS, THE SURFACE DIMENSIONS OF FOUNDATIONS HAVE 
TO BE ENLARGED FOR ABOUT 50%!.   

Assembly time, once foundations complete: 

3 hours

Required assistance

: 3 persons. 

Required tools:

 

wheel excavator a lifting height of approx. 7.50 m height

 

ladder approx. 3 m long,  

spirit level, various wrenches and screwdriver. 

Any spare parts which may be required can be obtained directly from your supplier or from  

Fa.Huck Seiltechnik GmbH 

 

Adress:

   Huck Seiltechnik GmbH 

 

Dillerberg 3 

 

D-35614 Aßlar/Berghausen 

 

Tel. +49 6443 8311-0 

 

Fax +49 6443 8311-79 

 

We hereby confirm that this item of play equipment has been tested  

and certified in accordance with the play equipment standard EN 1176-1.

 

Содержание 5000-6-6

Страница 1: ...614 Asslar Berghausen seiltechnik huck net www huck net 1 A Assembly Instructions Spider Art No 5000 6 6 Operator _________________________________________________________ Location ___________________...

Страница 2: ...t CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 2 Revision history Revision 0 2013 10 24 The first allowed version FH Assembly instruction Revision 8 2020 05 28 Da...

Страница 3: ...y contents parts list with part numbers 7 4 Required Spaces Top view 11 5 Post installation checks 26 B Maintenance Instructions Spider Art No 5000 6 6 27 6 Introduction Maintenance 29 7 General maint...

Страница 4: ...bH Adress Huck Seiltechnik GmbH Dillerberg 3 D 35614 A lar Berghausen Tel 49 6443 83 11 0 Fax 49 6443 83 11 79 Please do not hesitate to call your supplier if you have any problems during in stallatio...

Страница 5: ...be excavated 6 x 1 70 m long x 1 70 m wide total depth 1 20 m 1 x 1 20 m long x 1 20 m wide total depth 1 10 m including 10 cm drainage Foundation edges must be rounded off min R 100 mm Sizes of funda...

Страница 6: ...views of the complete item We reserve the right to change technical details of our articles which are serving for the further development of our articles and are reasonable for the customer Measuremen...

Страница 7: ...Post Connecter pre assembled on Pos 2 360 mm 7 1 Threaded bolt Nut Nylock nut Washer M 16 x 165 mm 8 6 Turnbuckles M 20 Stainless 9 6 Anker chains 13 mm x 1 60 m 10 12 Shackles M12 11 6 Foundation an...

Страница 8: ...000_6_6_ST_B_L_1_GBR doc 8 3 2 In symbols Table 3 2 Delivery contents in symbols Pos Quantity Symbol 1 1 upper steel mast 193 7 x 6 3 mm 7 22 m long 2 1 Spider Net component 3 2 membrane preassembled...

Страница 9: ...hains 1 60 m lenght 10 12 Shackles M12 galvanized 11 6 Foundation ankers 20 mm galvanized approx 750 m lengt 12 1 Steel Base Plate 500 mm x 500 mm 13 1 Lifting Rope 14 1 Assembley Ring must be removed...

Страница 10: ...ausen seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 10 Table 3 2 Delivery contents in symbols Pos Quantity Symbol 20 1 Middle Fou...

Страница 11: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 11 4 Required Spaces Top view Minimum space required by law...

Страница 12: ...K Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 12 Recommended minimum sp...

Страница 13: ...K Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 13 Screw locking device glue all screws nuts and sleeves with loctite not less than 5 drops except for lock...

Страница 14: ...K Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 14 Foundation plan Side v...

Страница 15: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 15 Foundation plan Top view...

Страница 16: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 16...

Страница 17: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 17 Installing...

Страница 18: ...Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 18 Installing Pos 2 Raise...

Страница 19: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 19 Net Alignment...

Страница 20: ...lerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 20 Net Tensioning Apply tension with 2 persons...

Страница 21: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 21...

Страница 22: ...eiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 22 Remove Installment Ring P...

Страница 23: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 23 Install Pos 4 and Pos 7 using Pos 15 Loctite...

Страница 24: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 24...

Страница 25: ...must be erected vertically with plumb line accuracy ML Post length above ground level Mo Connect O K Upper edge of playing level O K F Upper edge of foundation PS Impact area 109 m2 R Radius VO Preas...

Страница 26: ...safely in the following cases Safe equipment installation is not complete The protective surface has not been installed yet Appropriate maintenance work cannot guarantee operational safety 5 3 Removal...

Страница 27: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 27 B Maintenance Instructions Spider Art No 5000 6 6...

Страница 28: ...CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 28 Revision history Revision 0 2013 10 24 The first allowed version FH Maintenance instruction Revision 8 2020 05 28...

Страница 29: ...is inspected regularly cannot become so damaged that it is dangerous Any spare parts which may be required can be obtained directly from your supplier or from Fa Huck Seiltechnik GmbH Adress Huck Sei...

Страница 30: ...uncontrolled cold welding may occur when the nuts are tightened To prevent this it is necessary to spray the nuts and bolts with Teflon spray or another similar lubricant 7 4 Spare parts All spare par...

Страница 31: ...ensure that there are no missing screws e g look out for holes you can see through 7 12 Preventing equipment use Use of the equipment should be prevented in the event of incomplete installa tion disa...

Страница 32: ...equipment 8 1 2 Maintenance intervals in the event of intensive use Please note that more frequent inspections and or maintenance are required if the play equipment is subject to intensive use 8 1 3 F...

Страница 33: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 33 9 Regular maintenance...

Страница 34: ...ll attachments such as chains ropes nets etc for damage and replace if necessary 10 6 Check rubber parts sleeves etc for wear and tear or damage and re place if necessary 10 7 Check the surface of woo...

Страница 35: ...Annual maintenance 13 1 Ascertaining that the equipment foundations and surfaces are safe for operation 13 2 In particular the equipment should be checked for decay and corrosion It may be necessary...

Страница 36: ......

Страница 37: ...__ Location _______________________________________________________________________________________ Customer or operator _____________________________________________________________________________ T...

Страница 38: ......

Страница 39: ..._____________________________________________ ____________________________________________________________________ Competent person in charge __________________________________________________________...

Отзывы: