HUCK Seiltechnik GmbH • Dillerberg 3 • D-35614 Asslar-Berghausen
29
6
Introduction Maintenance
6.1
General informations
This equipment should be installed, inspected, maintained and operated in
accordance with EN 1176-7 guidelines.
Please note:
Providing any necessary repairs are carried out, a piece of
play equipment that is inspected regularly cannot become so damaged
that it is dangerous.
Any spare parts which may be required can be obtained directly from your
supplier or from Fa. Huck Seiltechnik GmbH
Adress:
Huck Seiltechnik GmbH
Dillerberg 3
D-35614 Aßlar/Berghausen
Tel. +49 6443 83 11-0
Fax +49 6443 83 11-79
This equipment should only be assembled, maintained and repaired by
persons with the necessary expertise
.
A copy of the inspection record should be given to the operator,
who must confirm receipt.
This maintenance instruction is based on the standard
“EN 1176-1”.
Содержание 5000-6-6
Страница 17: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 17 Installing...
Страница 19: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 19 Net Alignment...
Страница 21: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 21...
Страница 36: ......
Страница 38: ......