background image

Betriebsanleitung ACS-1000

Rev. 1.0 - 08/12

Hubitron Steuerungstechnik

Hubitron Steuerungstechnik, Hauptstr. 4/1, D-89611 Obermarchtal, Tel. +49(0)7375/922066, FAX +49(0)7375/922077

Seite 9 von 14

12.2 Charge accu

To charge the accu, the provided charging unit type

ALCS2-24A must be used.

  shut off the ACS-1000

  connect the  charging  unit  with the  connector  of

the ACS-1000

  connect  the  charging  unit  with  the  electrical

network

Now the green LED (12V) and the red LED (Charge)

should shine.

If  the  red  LED  (Charge)  goes  off,  the  charging

process is finished.

12.3 Change accu

Is the accu running time considerably declining, the

accu might be defect and must be changed. For an

accu change the unit must be sent  to  the  dealer  or

service address.

NOTE:

In  accordance  with  the  battery  regulations  dated.

01.10.98 old batteries & rechargeable batteries must

either  be  returned  to  the  store  or  given  to  a

communal collecting place. They are not allowed to

be discarded in regular garbage!

12.4 Packing / Storage

All  parts  can  be  stored  in  the  provided  transport

case.  Levelling  feet  and/or  magnets  must  be

mounted  on the  bottom  of  the  mounting  plate.  The

following  picture  shows  the  correct  arrangement  in

the case:

Содержание ACS-1000

Страница 1: ...ation and arrangement 4 8 1 1 Installation 4 8 1 2 Arrangement 5 8 2 Wire spanning and arranging 5 8 3 Height compensation 6 8 3 1 Adjustment of incline 6 8 4 Length compensation 7 8 4 1 Delete compen...

Страница 2: ...t case ACS 1000 1 Protector cap for sensor red 1 Light protector cap black 1 Inbus key SW4 4 Optional equipment 4 1 Remote control ACS 1000 RC With the remote control ACS 1000 RC all relevant function...

Страница 3: ...play This display appears for appr 2 seconds when the unit is switched on The SW version and the ID for the remote control is displayed 7 2 2 Main menu On the bottom the assignment of the function key...

Страница 4: ...rmation the next instruction will follow back to the compensation menu 7 2 5 Starting menu Graphic display set display data to 0 set display data to absolut switch to text display back to the compensa...

Страница 5: ...heet of paper DIN A4 position machine at the right outer stop arrange ACS 1000 that the laser beam remains within the reflection area A sideways deviation can be corrected by turning the ACS 1000 on t...

Страница 6: ...ION Now do not move the Z axis anymore move machine slide up until H 4 5 mm and is displayed confirm with NOTE Is the deviation larger 0 1 mm the incline of the sensor head must be corrected with the...

Страница 7: ...Is the length compensation not needed the last compensation data must be deleted start length compensation main menu delete data with 8 5 Start measurements Is the ACS 1000 arranged and compensated th...

Страница 8: ...esp have accu changed change fuse chapter 12 1 send unit for service display non readable altered contrast Readjust contrast 11 Activity to avoid interruptions 1 If the unit is not in use cover the se...

Страница 9: ...Charge goes off the charging process is finished 12 3 Change accu Is the accu running time considerably declining the accu might be defect and must be changed For an accu change the unit must be sent...

Страница 10: ...3 5 Charge accu connect the provided charging unit type ACS 110 with the connector of the ACS 1000 RC connect charging unit with the electrical network The red LED Charge indicates the charging proces...

Страница 11: ...tall the Software net Framework from Microsoft is required Is it not yet installed it will be automatically downloaded and installed during the installation Internet connection is required On the CD a...

Страница 12: ...disrupted 2 Transmit data record to table On the chosen measuring points each data record must be transmitted to the table 3 Print chart A window appears for customer and machine data Enter the custom...

Страница 13: ...ner Huber eMail Info Hubitron de www Hubitron de 02 08 2012 Manufacturer Hubitron Steuerungstechnik Hauptstr 4 1 89611 Obermarchtal Germany Product Alignment Calibration System ACS 1000 and Remote Con...

Страница 14: ...sanleitung ACS 1000 Rev 1 0 08 12 Hubitron Steuerungstechnik Hubitron Steuerungstechnik Hauptstr 4 1 D 89611 Obermarchtal Tel 49 0 7375 922066 FAX 49 0 7375 922077 Seite 14 von 14 Attachment Measuring...

Отзывы:

Похожие инструкции для ACS-1000