Section 100 System Installation Instructions

101. Specifications

Input

• Input voltage: Field Selectable 120 or 277Vac., (input voltage must be the same as output voltage).

• Input frequency: 60HZ ±2%

• Input surge protection: Meets UL 924

Output

• Output voltage: Field Selectable 120 or 277Vac., 60HZ., (output voltage must be the same as

 

input

voltage).

• Output frequency: Static ±5% based on a 0% - 100% resistive load

• Minimum loading: none required

• Output distortion: Less than 3% THD linear load

• Load power factor: .

88

 lead to .

88

 lag

• Output frequency: ±0.3 Hz during emergency

• Time to transfer to inverter after a utility power failure: <1 second

Battery

• Battery type: Maintenance free sealed Lead Calcium

• Battery charger: Fully automatic dual-mode with temperature compensation

• Recharge time: Meets UL requirements (96 Hours)

• Battery protection: Automatic low-battery voltage disconnect and reverse polarity protection.

• Standard batteries: Sealed Lead-Calcium: 7-year life

• Battery voltage: 60Vdc (375W) or 96Vdc (600W)

• Runtimes: 90 minutes standard

• Operating temperature: 20°C to 30°C (68°F to 86°F)

• Relative humidity: 95% non-condensing

Note: 

Lead Calcium battery performance rated at 25°C (77°F) for load.

Table 1 

System weights shown include installed batteries

MODEL  INPUT/OUTPUT  CAPACITY 

SYSTEM 

SYSTEM 

NUMBER  BATTERY  BATTERY 

AC INPUT 

THERMAL 

  NUMBER 

VOLTAGE 

For 1

1/2

 Hrs. 

WEIGHT 

EFFICIENCY 

OF 

VOLTAGE  CURRENT  CURRENT 

(MAX)

 

OUTPUT (BTUs)

(

Watts/VA) 

Lbs. 

Kg. 

(Full Load) 

BATTERIES 

(VDC) 

(Amps) 

120VAC  277VAC  On-Line  Emergency

LG375S

LG600S

120/277VAC

120/277VAC

375/375

600/600

113

172

51.3

78.1

98%

98%

5

8

60

96

7.3

7.1

3.43

5.50

1.49

2.38

11

15

205

275

18.0” (37.5cm)

18.0” (37.5cm)

16.625” (42.2275cm)

25.25” (64.135cm)

8.25” (20.32cm)

8.25” (20.32cm)

LG375S

LG600S

Содержание DUAL LITE LiteGear LG Series

Страница 1: ...Manual For LG Series For 375VA 375W 600VA 600W Large Inverter Power Systems Models LG375S Surface Mounted Version LG600S Surface Mounted Version LG375SI LG600SI Surface Mounted Version w Self Test Su...

Страница 2: ...rpose Servicing of this equipment should be performed by qualified service personnel SAVE THESE IMPORTANT SAFETY INSTRUCTIONS The installation and use of this product must comply with all national fed...

Страница 3: ...am 120Vac and 277Vac connections AC Input output Wiring Connections to Terminal Block Wiring Diagram Switched Dimming Control 120 277Vac Battery Information Tools Battery installation and Connection W...

Страница 4: ...Recharge time Meets UL requirements 96 Hours Battery protection Automatic low battery voltage disconnect and reverse polarity protection Standard batteries Sealed Lead Calcium 7 year life Battery vol...

Страница 5: ...s hard to detect because it is colorless ororless and lighter than air 103 Installation Requirements 103 1 Operating Environment Install the LG inverter system in a clean cool dry place with normal ve...

Страница 6: ...kouts provided using mounting hard ware not supplied sized appropriately to support the unit weight 105 AC Connections CAUTION A LG inverter system units contain hazardous AC and DC voltages Because o...

Страница 7: ...277Vac input connections as well as various modes of output opertion as described in this section Refer to the appropriate wiring diagrams to properly con nect the utility AC power fixtures and exter...

Страница 8: ...0 volts Load Operation Adjustable Output AO Option Functionally identical to the Switch Load Operation above but provides four 4 independent settings for each of the four dimmable loads See Wiring Dia...

Страница 9: ...R DIMMED CIRCUITS SHOWN Note ONLY 2 OF 4 POSSIBLE SWITCHED OR DIMMED CIRCUITS SHOWN See LiteGear loading table on the next page NOTE Dimming switches are designed for independent settings to allow dif...

Страница 10: ...gether or to ground earth Be extremely careful to avoid electric shock and burns caused by contacting battery terminals or shorting terminals during battery installation Do not touch uninsulated batte...

Страница 11: ...nd upwards Position batteries in the central locations towards rear of the compartments Carefully install battery retention brackets in each compartment with the supplied hardware Reference below imag...

Страница 12: ...12...

Страница 13: ...will damage the unit void the warranty and may cause a dangerous or unsafe condition 108 System Start Up Procedure IMPORTANT The LG inverter system is a sophisticated electronic backup power supply C...

Страница 14: ...d connected loads B Self testing and a 30 second discharge with a randomized start per UL 924 Sec 30 2 once every 30 days after normal utility power has been supplied for a minimum of 48 hours C Self...

Страница 15: ...warranty voided if not routinely recharged NOTE To turn power back on follow the System Start up Procedure outlined in Section 108 Be sure to complete all of the steps to ensure the unit will operate...

Страница 16: ...by the Manufacturer will void the UL listing of the system and may cause equipment failure To ensure the superior performance of your LG inverter system and to maintain proper charger operation repla...

Отзывы: