110. System Self-Tests

Once the system is properly installed in accordance with the installation instructions, and AC

 

power is 

supplied to the LG inverter system, the dual color (SDT STATUS) LED indicator will

 

illuminate, followed by 

the amber (INV ON) LED indicator. The dual color LED indicates the unit’s status. A steady GREEN LED 

indicates normal service; A blinking GREEN/RED LED

 

indicates the battery is charging; A blinking RED LED 

(in different combinations) indicates a service alert. Refer to the INDICATION chart in sections 110.2 for 

details. During loss of normal

 

utility

 power the dual color LED will not be illuminated. The AMBER (INV ON) 

LED indicator will be illuminated only during inverter operation initiated by the loss of utility power or during 

any manual or automatic self-test.

Do not touch components inside the unit. DC voltage is always present at the batteries and battery

 

cables. 

110.1 Self-Test/Diagnostic Functions

The self-diagnostic function is factory preset and performs the following:

A) Continuous monitoring of battery, battery charger and connected loads.
B) Self-testing and a (30) second discharge with a randomized start (per UL 924, Sec. 30.2), once

every (30) days, after normal utility power has been supplied for a minimum of (48) hours.

C) Self-testing and a (30) minute discharge with a randomized start (per UL 924, Sec. 30.2), once

every (180) days, after normal utility power has been supplied for a minimum of (48) hours.

D) Self-testing and a (90) minute discharge with a randomized start (per UL 924, Sec. 30.2), once

every (365) days, after normal utility power has been supplied for a minimum of (48) hours.

110.2 Self-Test/Diagnostic Indication

14.

109.2 For LG375SI and LG600SI

This model also provides for manual testing by pushing the TEST button in a specific pattern:
A)

B)
C)

Action

Reaction and LED Indication

Push test switch Once (within (2) seconds)

Push test switch Twice (within (2) seconds)

Push test swithc Three times (within (2) seconds)

Push test switch and hold for (3) seconds

Push test switch and hold for (6) seconds

(30) second test: one blink GREEN/pause

(30) minute test: two blinks GREEN/pause

(90) minute test: three blinks GREEN/pause

Cancels Test

System reset

INV ON status indicator (yellow) illuminates (indicates inverter is operational).
Normally-On, Normally-Off and Switched fixtures are illuminated (where applicable)

Содержание DUAL LITE LiteGear LG Series

Страница 1: ...Manual For LG Series For 375VA 375W 600VA 600W Large Inverter Power Systems Models LG375S Surface Mounted Version LG600S Surface Mounted Version LG375SI LG600SI Surface Mounted Version w Self Test Su...

Страница 2: ...rpose Servicing of this equipment should be performed by qualified service personnel SAVE THESE IMPORTANT SAFETY INSTRUCTIONS The installation and use of this product must comply with all national fed...

Страница 3: ...am 120Vac and 277Vac connections AC Input output Wiring Connections to Terminal Block Wiring Diagram Switched Dimming Control 120 277Vac Battery Information Tools Battery installation and Connection W...

Страница 4: ...Recharge time Meets UL requirements 96 Hours Battery protection Automatic low battery voltage disconnect and reverse polarity protection Standard batteries Sealed Lead Calcium 7 year life Battery vol...

Страница 5: ...s hard to detect because it is colorless ororless and lighter than air 103 Installation Requirements 103 1 Operating Environment Install the LG inverter system in a clean cool dry place with normal ve...

Страница 6: ...kouts provided using mounting hard ware not supplied sized appropriately to support the unit weight 105 AC Connections CAUTION A LG inverter system units contain hazardous AC and DC voltages Because o...

Страница 7: ...277Vac input connections as well as various modes of output opertion as described in this section Refer to the appropriate wiring diagrams to properly con nect the utility AC power fixtures and exter...

Страница 8: ...0 volts Load Operation Adjustable Output AO Option Functionally identical to the Switch Load Operation above but provides four 4 independent settings for each of the four dimmable loads See Wiring Dia...

Страница 9: ...R DIMMED CIRCUITS SHOWN Note ONLY 2 OF 4 POSSIBLE SWITCHED OR DIMMED CIRCUITS SHOWN See LiteGear loading table on the next page NOTE Dimming switches are designed for independent settings to allow dif...

Страница 10: ...gether or to ground earth Be extremely careful to avoid electric shock and burns caused by contacting battery terminals or shorting terminals during battery installation Do not touch uninsulated batte...

Страница 11: ...nd upwards Position batteries in the central locations towards rear of the compartments Carefully install battery retention brackets in each compartment with the supplied hardware Reference below imag...

Страница 12: ...12...

Страница 13: ...will damage the unit void the warranty and may cause a dangerous or unsafe condition 108 System Start Up Procedure IMPORTANT The LG inverter system is a sophisticated electronic backup power supply C...

Страница 14: ...d connected loads B Self testing and a 30 second discharge with a randomized start per UL 924 Sec 30 2 once every 30 days after normal utility power has been supplied for a minimum of 48 hours C Self...

Страница 15: ...warranty voided if not routinely recharged NOTE To turn power back on follow the System Start up Procedure outlined in Section 108 Be sure to complete all of the steps to ensure the unit will operate...

Страница 16: ...by the Manufacturer will void the UL listing of the system and may cause equipment failure To ensure the superior performance of your LG inverter system and to maintain proper charger operation repla...

Отзывы: