106.2 Battery Installation and Connection

Battery Placement:

The LG375S models are provided with (5) 12V Lead Calcium batteries (60Vdc string). The

LG600S models are provided with (8) 12V Lead Calcium batteries (96Vdc string).

LG375S: Carefully place all batteries in the unit battery (lower) compartment with positive (+) red

 

terminals facing outwards and upwards. Position batteries in the central location towards rear of the

 

compartment. Carefully install battery retention bracket with the supplied hardware. Reference below

 

image.

LPS-600: Carefully place (4) batteries in each of the battery (central and lower) compartments with 

positive (+) red terminals facing outwards and upwards. Position batteries in the central locations towards 

rear of the compartments. Carefully install battery retention brackets in each compartment with the 

supplied hardware. Reference below image.

LG375S

LG600S

60

96

5

8

1

2

IMPORTANT: Observe correct polarity on battery terminals

11.

Battery installation 

and wiring on the 

LG600S model 

(for reference)

Battery brackets installed on the front

Battery Wiring:

CAUTION: To prevent possible damage to the unit when connecting batteries, verify that the unit 

battery

 

circuit breaker CB-1 is in the OFF position.

Connect batteries with supplied wiring jumpers using hardware provided with batteries. For LG375

S

 

refer

 

to Battery Wiring Diagram 1. For LG600

S

 refer to Battery Wiring Diagram 2.

Battery Chart:

Model System

 

DC Voltage

 

Number of Batteries

 

Battery Part Number

 

Battery Wiring Diagram

93125537

93125537

Содержание DUAL LITE LiteGear LG Series

Страница 1: ...Manual For LG Series For 375VA 375W 600VA 600W Large Inverter Power Systems Models LG375S Surface Mounted Version LG600S Surface Mounted Version LG375SI LG600SI Surface Mounted Version w Self Test Su...

Страница 2: ...rpose Servicing of this equipment should be performed by qualified service personnel SAVE THESE IMPORTANT SAFETY INSTRUCTIONS The installation and use of this product must comply with all national fed...

Страница 3: ...am 120Vac and 277Vac connections AC Input output Wiring Connections to Terminal Block Wiring Diagram Switched Dimming Control 120 277Vac Battery Information Tools Battery installation and Connection W...

Страница 4: ...Recharge time Meets UL requirements 96 Hours Battery protection Automatic low battery voltage disconnect and reverse polarity protection Standard batteries Sealed Lead Calcium 7 year life Battery vol...

Страница 5: ...s hard to detect because it is colorless ororless and lighter than air 103 Installation Requirements 103 1 Operating Environment Install the LG inverter system in a clean cool dry place with normal ve...

Страница 6: ...kouts provided using mounting hard ware not supplied sized appropriately to support the unit weight 105 AC Connections CAUTION A LG inverter system units contain hazardous AC and DC voltages Because o...

Страница 7: ...277Vac input connections as well as various modes of output opertion as described in this section Refer to the appropriate wiring diagrams to properly con nect the utility AC power fixtures and exter...

Страница 8: ...0 volts Load Operation Adjustable Output AO Option Functionally identical to the Switch Load Operation above but provides four 4 independent settings for each of the four dimmable loads See Wiring Dia...

Страница 9: ...R DIMMED CIRCUITS SHOWN Note ONLY 2 OF 4 POSSIBLE SWITCHED OR DIMMED CIRCUITS SHOWN See LiteGear loading table on the next page NOTE Dimming switches are designed for independent settings to allow dif...

Страница 10: ...gether or to ground earth Be extremely careful to avoid electric shock and burns caused by contacting battery terminals or shorting terminals during battery installation Do not touch uninsulated batte...

Страница 11: ...nd upwards Position batteries in the central locations towards rear of the compartments Carefully install battery retention brackets in each compartment with the supplied hardware Reference below imag...

Страница 12: ...12...

Страница 13: ...will damage the unit void the warranty and may cause a dangerous or unsafe condition 108 System Start Up Procedure IMPORTANT The LG inverter system is a sophisticated electronic backup power supply C...

Страница 14: ...d connected loads B Self testing and a 30 second discharge with a randomized start per UL 924 Sec 30 2 once every 30 days after normal utility power has been supplied for a minimum of 48 hours C Self...

Страница 15: ...warranty voided if not routinely recharged NOTE To turn power back on follow the System Start up Procedure outlined in Section 108 Be sure to complete all of the steps to ensure the unit will operate...

Страница 16: ...by the Manufacturer will void the UL listing of the system and may cause equipment failure To ensure the superior performance of your LG inverter system and to maintain proper charger operation repla...

Отзывы: