Mechanical Installation
5
Dual-LIte
®
TRX
™
MBC
™
1.4.2
Clearances
Dual-Lite TRX MBC’s have no ventilation grilles at either side or at the rear. Clearance around the
front of the equipment should be sufficient to enable free passage of personnel with the doors fully
opened. It is important to leave a distance of 24" (610mm) between the top of the cabinet and any
overhead obstacles to permit adequate circulation of air coming out of the unit.
1.4.3
Floor Installation/Anchoring
The installation diagrams in
of this manual identify the location of the
holes in the base plate through which the equipment can be bolted to the floor. If the equipment is to
be located on a raised floor it should be mounted on a pedestal suitably designed to accept the
equipment point loading.
1.5
Cable Entry
Cables can enter the Dual-Lite TRX MBC from the bottom or top.
!
AVERTISSEMENT
Le centre de gravité élevé des appareils présente un risque de renversement lors des
déplacements pouvant entraîner des dommages matériels, des blessures et même la mort.
Faites preuve d’une extrême prudence lors de la manutention des armoires afin d’éviter de les
endommager ou de blesser le personnel. Les armoires de dérivation d’entretien TRX de
Dual-Lite pèsent de 198 à 700 lb (de 89.8 à 317.5 kg).
Identifiez les symboles de centre de gravité et déterminez le poids de l’appareil avant de
manipuler chaque armoire. Testez le levage et l’équilibre des armoires avant de transporter
l’appareil. Maintenez en tout temps l’inclinaison verticale minimale.
Содержание Dual-Lite TRX MBC
Страница 1: ...Dual Lite TRX MBC User Manual 10 30kVA 60Hz...
Страница 2: ......
Страница 24: ...DL 25652_REV0_02 16 Dual Lite TRX MBC User Manual 10 30kVA 60Hz...