UPS2000-A-(6 kVA-10 kVA)-RTL
User Manual
3 Installation
Issue 07 (2020-01-10)
Copyright © Huawei Technologies Co., Ltd.
26
Only trained personnel are allowed to move the UPS.
Do not move the UPS by holding its mounting brackets, front panel, terminal cover, or
monitoring module.
Built-in batteries are used for 6 kVA/10 kVA standard version with standard backup time.
Exercise caution when moving them. Prevent the UPS from falling over; otherwise, fire
accidents may occur. Remove rings, watches, and other metal objects when you move the
UPS with built-in batteries.
Do not turn over the UPS during transportation.
To prevent shocks or falls, move the UPS gently. After placing the UPS in the installation
position, unpack it carefully to prevent scratches.
Procedure
Step 1
Visually inspect the UPS appearance for shipping damage. If any shipping damage is found,
report it to the carrier immediately.
Step 2
Move the UPS to the installation position.
Step 3
Unpack the case.
Step 4
Check the UPS.
1.
Visually inspect the UPS appearance for shipping damage. If any shipping damage is
found, report it to the carrier immediately.
2.
Check the UPS bar code, which is at the top of the UPS, and ensure that it complies with
the order. If there is any discrepancy, contact your local Huawei office immediately.
3.
Check that the fittings comply with the packing list. If some fittings are missing or do
not comply with the packing list, record the information and contact your local Huawei
office immediately.
----End
3.2 Single UPS Installation
The UPS installation process covers installing devices, routing cables, and connecting cables.
3.2.1 Installing Devices
3.2.1.1 Tower Mounting
Procedure
Step 1
Unscrew and remove the wiring terminal cover.