TP48200A-DT19C1 & DT19C2 & HT19C1 & HT19C2
Installation Guide
7 Installing Cables
Issue 03 (2014-02-23)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
73
Figure 7-13
Removing cables
Step 4
Take the short-circuit cables from the fitting bag and install them onto the Ub, Uc, and Un.
Figure 7-14
Installing the short-circuit cables
Step 5
Reinstall the voltage detection wiring terminal for the intelligent electric meter.
Step 6
Reinstall the cover for the meter.
----End
Changing the Cable Connection for the Maintenance Socket
Step 1
Remove the protective cover from the maintenance socket.