TP48200A-DT19C1 & DT19C2 & HT19C1 & HT19C2
Installation Guide
4 Installing Cabinets
Issue 03 (2014-02-23)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
42
Figure 4-2
Taking down the marking-off template
Step 2
Drill holes in the positions for four mounting holes on the marking-off template.
Step 3
Mark the hole positions based on the marking-off template, as shown in
Figure 4-3
Marking mounting holes for the cabinet
(1) Marker
(2) Marking-off template
(3) Mounting holes
(4) Concrete floor
----End
4.4 Drilling Holes and Installing Expansion Sleeves
Procedure
Step 1
Drill holes to a depth of 52 mm to 60 mm using a hammer drill.
Step 2
Partially tighten each expansion bolt, place it vertically into the hole, and use a rubber mallet
to pound it until the expansion sleeve completely enters the hole.
Step 3
Partially tighten the expansion bolts.