TP48120A-HD15A1 & TP48120A-HD15A2 &
TP48200A-HD15A1 & TP48200A-HD15A2
Installation Guide
7 Installing Cables
Issue 03 (2014-12-02)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
59
Step 2
Remove the plastic cover from AC input circuit breakers.
Step 3
Install the short-circuit copper bar on the AC input circuit breakers.
Step 4
Route the 220 V AC single-phase input power cable into the cabinet through the hole in the
left part of the cabinet bottom.
Step 5
Secure the live wire to the corresponding screw on the short-circuit copper bar.
Step 6
Connect the neutral wire to the N wiring terminal.
Figure 7-11
Installing a 220 V AC single-phase input power cable
(1) ACDB
Step 7
Reinstall the plastic cover on the AC input circuit breakers.
----End