![Huawei SUN2000-100KTL Скачать руководство пользователя страница 112](http://html.mh-extra.com/html/huawei/sun2000-100ktl/sun2000-100ktl_user-manual_168472112.webp)
Step 4 Connect the USB flash drive to the USB port. The system automatically identifies
the USB flash drive and executes all commands specified in the boot script file.
View the LED indicator to determine the operating status.
NO TICE
Verify that the ciphertext in the boot script file matches the login password of the
SUN2000 app. If they do not match and you insert the USB flash drive for five
consecutive times, the user account will be locked for 10 minutes.
Table 7-10 LED indicator description
LED Indicator
Status
Meaning
Green off
There is no operation
with a USB flash drive.
Blinking green slowly
There is an operation
with a USB flash drive.
Blinking green fast
An operation with a USB
flash drive has failed.
Steady green
An operation with a USB
flash drive is successful.
----End
7.3.3 Exporting Data
Procedure
Step 1 Click Local maintenance script on the SUN2000 app to generate a boot script
file, see the
FusionSolar APP and SUN2000 APP User Manual
.
Step 2 Import the boot script file to the root directory of a USB flash drive.
Step 3 Connect the USB flash drive to the USB port. The system automatically identifies
the USB flash drive and executes all commands specified in the boot script file.
View the LED indicator to determine the operating status.
NO TICE
Verify that the ciphertext in the boot script file matches the login password of the
SUN2000 app. If they do not match and you insert the USB flash drive for five
consecutive times, the user account will be locked for 10 minutes.
SUN2000-(75KTL, 100KTL, 110KTL, 125KTL) Series
User Manual
7 Man-Machine Interactions
Issue 11 (2021-11-10)
Copyright © Huawei Technologies Co., Ltd.
103