SmartLi
User Manual
3 Installation
Issue 04 (2019-09-16)
Copyright © Huawei Technologies Co., Ltd.
40
Cables are routed from inside out.
After routing cables, use sealing putty to seal the gaps between the cables and the cabinets.
If the load of a single battery cabinet is less than or equal to 150 kW, you are advised to set
the I1 value of the battery circuit breaker to the MIN value shown in the figure and use
cables with a cross-sectional area of 120 mm
2
or larger. If the load of a single battery
cabinet is greater than 150 kW, you are advised to use cables with a cross-sectional area of
150 mm
2
or larger.
Figure 3-26
Setting I1 to the MIN value
Procedure
Step 1
Install power cables.
Figure 3-27
Installing power cables
Step 2
Install a control cable to the UPS.