SmartLi
User Manual
3 Installation
Issue 04 (2019-09-16)
Copyright © Huawei Technologies Co., Ltd.
38
Figure 3-23
Installing the battery management module
----End
3.2.3.4 Remote EPO
Huawei does not provide the EPO switch or cable. If the cable is required, the
recommended cable is 22 AWG.
Equip the EPO switch with a protective cover to prevent misoperations, and cover the
cable with protective tubing.
Connect the EPO button to the EPO port on the SmartLi using the cable.