8
4
Verifying the Installation
No.
Acceptance Criteria
1
The solar inverter is installed correctly and securely.
2
Cables are routed properly as required by the customer.
3
Cables are evenly tied and no burr exists.
4
The PE cable is connected correctly, securely, and reliably.
5
The DC switch and all the switches connecting to the solar inverter are OFF.
6
The AC output power cable and DC input power cables are connected correctly, securely,
and reliably.
7
Unused terminals and ports are locked by watertight caps.
8
The installation space is proper, and the installation environment is clean and tidy.
Installing an 10-in 1-out SmartACBox
1
Overview
Appearance
(1) Handles
(2) Monitoring
compartment door
(3) Enclosure door lock
(4) Power compartment
door
(5) Mounting plate
(6) Mounting bracket
Ports
(1) Waterproof connector
for the RS485
communications cable
(COM)
(2) Waterproof
connector for the
3G/4G antenna
(3G/4G)
(3) Waterproof connector
for the single-phase
power cable (AC
INPUT)
(4) AC output cable
hole (AC
OUTPUT)
(5) AC input cable hole 1
(AC INPUT1)
(6) AC input cable
hole 2 (AC
INPUT2)
(7) USB port (USB)
(8) Ventilation valve
(9) Protective earthing (PE)
point
Содержание SmartACBox
Страница 23: ...22 ...