6 Operation
Issue 03 (2018-05-15)
Copyright © Huawei Technologies Co., Ltd.
46
Figure 6-1
Installing a cover
----End
6.3 Powering On the System
Prerequisites
You have put on insulation gloves.
Procedure
Step 1
Switch circuit breaker QF13 on the AC output side to ON.
Step 2
Switch circuit breakers QF01 to QF12 on the AC input side to ON one by one.
Step 3
Switch circuit breaker QF14 in the monitoring compartment to ON.
----End
6.4 Powering Off the System
Prerequisites
You have put on insulation gloves.
Procedure
Step 1
Switch circuit breaker QF14 in the monitoring compartment to OFF.
Step 2
Switch circuit breakers QF01 to QF12 on the AC input side to OFF one by one.
Step 3
Switch circuit breaker QF13 on the AC output side to OFF.
----End