1
Changes in the RRU3942 Installation Guide
This chapter describes the changes in the
RRU3942 Installation Guide
.
02()
This is the second official release.
Compared with issue 01 (2011-09-30), this issue includes the following new information:
l
Hoisting an RRU and Related Cables onto a Tower
l
Hoisting Fiber Optic Cables onto a Tower
l
Hoisting Power Cables onto a Tower
Compared with issue 01 (2011-09-30), this issue includes the following changes:
Topic
Change Description
Added the requirements for powering on the
cabinet and module.
Optimized cabling requirements.
Compared with issue 01 (2011-09-30), no information is deleted from this issue.
01 (2011-09-30)
This is the first official release.
RRU3942
Installation Guide
1 Changes in the RRU3942 Installation Guide
Issue ()
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
1