Installation Manual
Quidway S3000-EI Series Ethernet Switches
Chapter 3 Installation
3-11
3.6 Post-installation Checklist
Check that whether the power to be used is consistent with that labeled on the
switch.
Whether the ground wire is connected.
Check whether the Console cable and power cord are correctly connected.
Check if all the interface cables run indoors. If there is any cable outdoors, check
if you have connected the AC lightning protection bar and network port lightning
protection device.