PowerCube 5000
User Manual (SmartLi 100Ah)
3 Installation
Issue 02 (2020-03-17)
Copyright © Huawei Technologies Co., Ltd.
79
Figure 3-28
Connecting signal cables
(1) BCU in lithium
battery cabinet 1
(master cabinet)
(2) BCU in
lithium battery
cabinet 2
(3) BCU in
lithium battery
cabinet 3
(4) EPO button contact
in the master lithium
battery cabinet
Figure 3-29
Signal cable routing for a lithium battery cabinet
You are advised to arrange the master and slave cabinets from left to right to ensure that the cabinet
numbers are consistent with those on the page of the monitoring system.