Installation Check
No.
Check Item
1
Antennas are correctly installed. Specifically, the side with a wider shroud faces upward and the side
with a narrower shroud faces downward.
2
An antenna support bar is vertical with an antenna radome.
3
The drainage holes on an antenna are on a vertical line. After the antenna is installed, open the
lower drainage hole.
4
No device is damaged or deformed.
5
All outdoor connectors and ground clips are waterproofed.
6
The elliptical waveguide is grounded based on specifications.
7
The two ends of the elliptical waveguide are straightly routed for at least 50 cm ( 20 in ) before they
are bent.
8
Clamps are installed at 1 m ( 3.28 ft ) intervals.
9
The wall through plate is sealed and there is no visible gap.
10
The dehydrator is correctly connected to the air hole of the elliptical waveguide. No gas is leaked.
11
The dehydrator is working properly. The indicator is steady green, and no alarm is reported.