Commissioning Process
Powering On the
Equipment
Page 50
Start
Aligning the
Antennas
Pages
52 to 54
Checking the Radio
Link Status
Page 54
Aligning the Dual-
Polarized Antennas
Pages
53 to 54
Aligning the Single-
Polarized Antennas
Pages
52 to 53
End
Configuring the NE
Data (by Using the
Web LCT)
Page 51