1
Commissioning Process
Powering On the
Equipment
Page 29
Start
Configuring the NE
Data (by Using the
Web LCT)
Page 30
Aligning the
Antennas
Pages
31 to 33
Checking the Radio
Link Status
Page 33
Aligning the Dual-
Polarized Antennas
Pages
32 to 33
Aligning the Single-
Polarized Antennas
Pages
31 to 32
End