
32
3 Installing/Routing External Fibers
Complete Fiber Routing
– Install the Side Panel and Rat Guards
c
1
1
Insert the side panel according to the figure. Do
not clamp optical fibers.
2
2
Install screws in four positions marked in the
figure.
3
3
Install the ground cable. (The ground points on
the side panels are symmetrical).
4
4
Tailor rat guards from the inside based on the
number of fibers to be routed. Clean sharp edges or
burrs if necessary.