![Huawei ETP48400-C9A2 Скачать руководство пользователя страница 64](http://html.mh-extra.com/html/huawei/etp48400-c9a2/etp48400-c9a2_user-manual_169590064.webp)
ETP48400-C9A2 Embedded Power
User Manual
6 Commissioning
Issue 05 (2020-04-07)
Copyright © Huawei Technologies Co., Ltd.
57
6.9 Subsequent Operations
Procedure
Step 1
Reinstall the removed cover or panel if any.
Step 2
Check whether the paint on the subrack exterior is intact. If any paint has flaked, repaint the
area to avoid corrosion.
Step 3
Ensure that the site is clean before you leave the site.
----End