1
Contents
Installation Tools
…………………………………
Installation Scenarios
……………………………
BBU Hardware
……………………………………
Installation Procedure
……………………………
Installing the BBU in the APM30
………………
Installing the BBU in the APM30H(Ver.A)
……
Installing the BBU in the 19-Inch Rack
…………
Installing the BBU in the TMC
……………………
Installing the BBU in the PS4890 Cabinet
……
Installing the BBU in the RRU3004 Rack
………
Installing the IMB03 on the H-Shaped Stand
…
Installing the RRU on the H-Shaped Stand
…
Installing the BBU on the Wall
…………………
Installing the BBU in the APM30H(Ver.B)
……
Installing the BBU in the TMC11H(Ver.B)
……
Installing the BBU in the
APM30H(Ver.B, +24V)
……………………………
Installing the BBU in the OMB
…………………
BBU Hardware Installation Checklist
…………
Powering On the BBU
……………………………
Obtaining the ESN
………………………………
Appendix
……………………………………………
Change History
……………………………………
2
3
5
6
7
13
15
17
20
23
27
28
29
33
37
39
41
47
47
48
48
56
Copyright © Huawei Technologies Co., Ltd. 2011. All rights reserved.