28
Installation of indoor unit
Step one: choosing installation location
Step two: open piping hole
Recommend the installation location to the client and then confirm it with the client.
1. Choose the position of piping hole according to the direction of outlet pipe.
2. Open a piping hole with the diameter of
Ф70 on the selected outlet pipe
position. In order to drain smoothly, slant the piping hole on the wall slightly
downward to the outdoor side with the g
radient of 5-10°.
1. The pipe can be led out in the
2. After confirming the direction of outlet pipe,
loosen the screws at the upper and lower
direction of left, right or rear.
adjusting baffle to let the connection pipe
/drain pipe connects the indoor unit.
Step three: outlet pipe
Note:
● Pay attention to dust prevention and
take relevant safety measures when
opening the hole.
left
back
right
upper and lower adjusting baffle
left
back
right
Step four: connect the pipe of indoor unit
1. Take out the left and right screw cover and then remove the
screws on air-inlet
panel to remove the panel.
Indoor
5-10
outdoor
Φ70
screw
air-inlet panel