background image

lp-32 Rev. 003 Rel. 010 Date 2.22.19

5

Figure 2 - Specifications and Dimensions

36.00°

78.00°

45.00°

36.00°

D

C

E

B

A

INLET/OUTLET

OUTLET

COLD WATER

HOT

T&P

DRAIN

CONTROL

WELL

 C 

A

E

 B 

 D 

DIMENSIONS

MODEL

A

B

C

D

E

TEST 

PRESSURE

WORKING 

PRESSURE

WEIGHT 

(LBS)

CONNECTION 

SIZES

SSU-20CB 19-1/4"

4-1/2"

14-1/2"

21-3/4"

27-1/2"

300 PSI

150 PSI

25

3/4" NPT

T

P

N

 "

4

/

3

0

4

"

2

/

1

-

9

3

"

4

/

3

-

3

3

"

2

/

1

-

4

1

"

2

/

1

-

4

"

4

/

1

-

9

1

B

C

0

3

-

U

S

S

T

P

N

 "

4

/

3

4

6

"

2

/

1

-

9

5

"

4

/

3

-

5

4

"

2

/

1

-

4

1

"

2

/

1

-

4

"

4

/

1

-

9

1

B

C

5

4

-

U

S

S

T

P

N

 "

1

0

9

"

2

/

1

-

2

5

"

4

/

3

-

5

4

"

2

/

1

-

4

1

"

2

/

1

-

4

"

4

/

1

-

3

2

B

C

0

6

-

U

S

S

T

P

N

 "

2

/

1

-

1

9

2

1

"

2

7

"

4

/

3

-

4

6

"

6

1

"

6

"

4

/

1

-

3

2

B

C

0

8

-

U

S

S

T

P

N

 "

2

/

1

-

1

8

7

1

"

2

/

1

-

3

7

"

6

6

"

4

/

1

-

7

1

"

4

/

1

-

7

"

7

2

B

C

9

1

1

-

U

S

S

LP-32-C

02/21/19

N

O

L

L

A

G

 

9

1

1

/

0

8

 

60 GALLON

20/30/45 GALLON

02/21/19

THERMOSTAT

LOCATION

A

 C 

 D 

 B 

 E 

C. Hot Water Outlet

20 - 45 Gallon Storage Tanks: 

Use both thread tape and pipe dope 

to connect a 

3/4

” NPT brass tee. In the run of the brass tee, install a 

3/4

” NPT brass T&P long element for hot water heaters, as required 

by local codes, but not less than a valve certified for meeting the 

requirements for relief valves for water heaters (ANSI Z21.22 and 

CAN1-4.4) by a nationally recognized lab that maintains periodic 

inspection of production of listed equipment. The T&P valve must be 

plumbed down, so discharge will exit at least 6” above the structural 

floor and not contact any live electrical parts. In the bottom of the 

tee (branch) vertically down, install a 

3/4

” NPT x 

3/4

” (minimum) tube 

adapter. Then install two 

3/4

” (minimum) sweat street 90 degree 

elbows.
It may be recommended to use a back flow preventer - check local 

codes. If a back flow preventer or no return valve is used, a thermal 

expansion tank must be installed on the cold water supply between 

the tank and valve. If the tank is replacing a tankless coil in the boiler, 

disconnect coil plumbing and use the cold water inlet and hot water 

outlet pipes for the boiler.

60 Gallon Storage Tanks: 

Use both thread tape and pipe dope to 

connect a 1” NPT brass tee. In the run of the brass tee, install a 1” NPT 

brass T&P long element for hot water heaters, as required by local 

codes, but not less than a valve certified for meeting the requirements 

for relief valves for water heaters (ANSI Z21.22 and CAN1-4.4) by 

a nationally recognized lab that maintains periodic inspection of 

production of listed equipment. The T&P valve must be plumbed 

down, so discharge will exit at least 6” above the structural floor and 

not contact any live electrical parts. In the bottom of the tee (branch) 

vertically down, install a 1” NPT x 1” (minimum) tube adapter. Then 

install two 1” (minimum) sweat street 90 degree elbows.

80 and 119 Gallon Storage Tanks:

 Use 1 

1/2

” NPT nominal pipe size. A 

T&P port is included on 80 and 119 gallon tanks.

NOTE:

 For more information, see “Typical Installation”, page 8.

Содержание Superstor Ultra SSU CB Series

Страница 1: ...could result in substantial property damage severe personal injury or death The manufacturer reserves the right to make product changes or updates without notice and will not be held liable for typog...

Страница 2: ...bustibledoororremovable panel is acceptable front clearance This storage tank has been approved for closet installation and installation on combustible flooring Install the storage tank in a location...

Страница 3: ...ping where it will not be exposed to freezing temperatures All piping should be insulated Additionally place the storage tank so that the drain controls and inlets outlets are easily accessible NOTE T...

Страница 4: ...up to the installer to ensure the water does not contain corrosive chemicals or elements that can damage the heat exchanger Potable water is defined as drinkable water supplied from utility or well w...

Страница 5: ...6 above the structural floor and not contact any live electrical parts In the bottom of the tee branch vertically down install a 3 4 NPT x 3 4 minimum tube adapter Then install two 3 4 minimum sweat...

Страница 6: ...L INJURY OR DEATH E Potable Expansion Tank A potable hot water expansion tank may be required to offset heated water expansion If there is a back flow preventer or any other type of no return or check...

Страница 7: ...system by opening a hot water outlet at a fixture in a kitchen or bathroom When water flows freely from the outlet the system is purged Part 5 Start Up and Operation When filling the storage tank open...

Страница 8: ...e operating range Temperatures Verify safe settings on Mixing Valve if installed in system Electrical Smoke and CO Detectors Verify devices are installed and working properly Change batteries if nec e...

Страница 9: ...eck Not enough space heat Boiler sized too small Consult chart Slow recovery Circulator head capacity too low T P Valve Discharges Hot Tubs Spas Multiple Showers High Demand Problem Possible Solution...

Страница 10: ...entive maintenance can help avoid any unnecessary breakdown of the storage tank and keep it running at optimum efficiency 4 Maintain all related system components in good operating condition 5 Use the...

Страница 11: ...ponents or heaters returned to HTP for warranty analysis will become the property of HTP and will not be returned even if credit is denied If you have questions about the coverage of this warranty ple...

Страница 12: ...e of Installation Installation Address Product Name Serial Number s Comments Installer s Code Name Installers Phone Number Signed by Installer Signed by Customer IMPORTANT Customer Please only sign af...

Отзывы: