Assembly Procedure
Document Ref:
AP3607157
Issue:
01
Issue Date:
19 December 2019
Page 17 of 21
Drawing:
Shown on Works Order
Description:
A2A SPACER AUSTRALIA
SI No: N/A, Issue 2, 26 Jun 2017
Mask faults and defects
Inspection should be carried out with the part at arm’s length.
Air bubbles
Flow lines and water marks