T
T
e
e
c
c
h
h
n
n
i
i
c
c
a
a
l
l
D
D
e
e
s
s
c
c
r
r
i
i
p
p
t
t
i
i
o
o
n
n
,
,
O
O
p
p
e
e
r
r
a
a
t
t
i
i
n
n
g
g
,
,
M
M
a
a
i
i
n
n
t
t
e
e
n
n
a
a
n
n
c
c
e
e
a
a
n
n
d
d
R
R
e
e
p
p
a
a
i
i
r
r
M
M
a
a
n
n
u
u
a
a
l
l
Document No.: 304S/MM
Date of Issue:
08/14
3-4
H
P
H
Ltd.
3.3 Special Inspection Procedure
3.3.1 After hard landing and ground loops
No.
Workflow
Donne by
01
check landing gear bulkheads below forward shear carry
through tube
02
check landing gear mounting at forward main bulkhead
03
check upper and lower part (trailing fork) of landing gear;
check folding struts and dumper rings
04
check fuselage to wing joint (shear pins, carry through
tubes and their integration into the fuselage shell)
05
check bulkhead below rear carry through tube
06
check upper and lower wing shells for wrinkles and cracks
07
check spar tunnel floor below spar in the fuselage (between
forward and rear main bulkhead)
08
check fuselage shell for wrinkles and cracks
09
check tail plane and rudder shells for wrinkles and cracks
10
check fuselage tail boom at the root of the vertical stabilizer
(fin) and the join of the horizontal stabilizer to the fin