a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Disconnect any external cables that are connected to the expansion board.
4.
Do one of the following:
• Extend the server from the rack (
Extend the server from the rack
on page 42).
• Remove the server from the rack (
Remove the server from the rack
on page 42).
5.
Remove the access panel (
on page 44).
6.
Disconnect any internal cables that are connected to the expansion board.
7.
If any full-length expansion boards are installed, release the full-length expansion board retainer (
the full-length expansion board retainer
on page 44).
8.
Remove the PCIe riser cage.
9.
To replace the component, reverse the removal procedure.
To replace the component, reverse the removal procedure.
Removing and replacing the tertiary PCIe riser cage
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server unless all PCI
slots have either an expansion slot cover or an expansion board installed.
Procedure
1.
Power down the server (
on page 41).
2.
Remove all power:
Removal and replacement procedures
55
Содержание ProLiant DL388 Gen10
Страница 37: ...Customer self repair 37...
Страница 38: ...38 Customer self repair...
Страница 39: ...Customer self repair 39...
Страница 83: ...6 Remove the cable protection panel 7 Remove the chassis ear Removal and replacement procedures 83...
Страница 147: ...Option 1 System board Option 2 Controller Option 3 not shown SAS Expander Cabling 147...
Страница 149: ...Box 1 to SAS Expander Box 2 to SAS Expander Cabling 149...
Страница 150: ...All boxes Cable routing Front 8SFF NVMe SAS premium drive option The backplane shown is in box 3 150 Cabling...
Страница 151: ...Cable routing Front 8SFF NVMe drive options Box 1 Box 2 Cabling 151...
Страница 152: ...Box 3 Cable routing Front 2SFF NVMe drive option for SFF 152 Cabling...
Страница 153: ...Cable routing Front 2SFF NVMe drive option for LFF Cable routing Midplane 4LFF drive option Cabling 153...